My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150303 Feasibility Study
CWCB
>
Loan Projects
>
DayForward
>
1001-2000
>
C150303 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/26/2011 8:47:07 AM
Creation date
2/26/2010 1:01:13 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150303
Contractor Name
Trinchera Irrigation Company
Contract Type
Loan
Water District
35
County
Costilla
Loan Projects - Doc Type
Feasibility Study
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
273
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Acknowledgement of those who assisted in the preparation of this report: <br />Matthew J. Gavin, P.E. <br />Dam Safety Field Engineer, Division 7, Durango <br />Dam Inspector <br />Allen Davey, P.E. <br />Davis Engineering Service, Inc. <br />Project Engineer <br />Rodger Wakasugi <br />Trinchera Irrigation Company <br />Shareholder / Photographer <br />Jerry W. Smith <br />Trinchera Irrigation Company <br />Shareholder / Project Coordinator <br />Robert Schultz <br />Water Commissioner, District 35, Division 3 <br />Kirk Russell and Anna Mauss <br />CWCB <br />Jane Devine <br />Trinchera Irrigation Company <br />Office Manager <br />
The URL can be used to link to this page
Your browser does not support the video tag.