Laserfiche WebLink
9.0 IMPLEMENTATION <br />LLRC intends to utilize the water rights subject to this CWCB loan application for augmentation <br />beginning in Apri12011. It is anticipated that the water rights will be utilized for irrigation purposes <br />on the Klein farm during the 2010 irrigation season for purposes of establishing native vegetation. <br />LLRC anticipates amending its water court application for the plan for augmentation by adding the <br />subject water rights prior to December 31, 2010. <br />The following schedule is proposed for implementation of the project: <br />Task <br />1. <br />2. <br />3. <br />4. <br />5. <br />6. <br />7. <br />8. <br />Feasibility Study <br />Klein Farm Purchase <br />Schmidt Farm Purchase <br />Design <br />Bid <br />Award Bid <br />Start Construction <br />Project Completion <br />Tar eg Completion Date <br />12/ 1 /09 <br />12/ I S/09 <br />12/15/09 <br />1/31/10 <br />2/15/10 <br />3/15/10 <br />4/1/10 <br />6/1/10 <br />10.0 PERMITTING <br />No easements, rights of ways or other permits are required far the water rights purchases. <br />Furthermore, LLRC does not anticipate Federal, State, County or local permitting requirements far <br />the construction of the recharge ponds and ancillary facilities; however, this will be confirmed prior <br />to construction. <br />11.0 INSTITUTIONAL CONSIDERATIONS <br />� <br />_ Entities that are involved in the design, construction, and financing of the project include: <br />_ Lower Latham Reservoir Company; financing and project management. <br />Lower Latham Asset Management Company; project management. <br />NoCo Engineering, Inc.; engineering, design and project management. <br />-17- <br />