My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150304 feas study
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
C150304 feas study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2015 3:13:51 PM
Creation date
2/24/2010 10:53:00 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
CT2015-032
C150304
Contractor Name
Lower Latham Reservoir Company
Contract Type
Loan
County
Weld
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
157
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
9.0 IMPLEMENTATION <br />LLRC intends to utilize the water rights subject to this CWCB loan application for augmentation <br />beginning in Apri12011. It is anticipated that the water rights will be utilized for irrigation purposes <br />on the Klein farm during the 2010 irrigation season for purposes of establishing native vegetation. <br />LLRC anticipates amending its water court application for the plan for augmentation by adding the <br />subject water rights prior to December 31, 2010. <br />The following schedule is proposed for implementation of the project: <br />Task <br />1. <br />2. <br />3. <br />4. <br />5. <br />6. <br />7. <br />8. <br />Feasibility Study <br />Klein Farm Purchase <br />Schmidt Farm Purchase <br />Design <br />Bid <br />Award Bid <br />Start Construction <br />Project Completion <br />Tar eg Completion Date <br />12/ 1 /09 <br />12/ I S/09 <br />12/15/09 <br />1/31/10 <br />2/15/10 <br />3/15/10 <br />4/1/10 <br />6/1/10 <br />10.0 PERMITTING <br />No easements, rights of ways or other permits are required far the water rights purchases. <br />Furthermore, LLRC does not anticipate Federal, State, County or local permitting requirements far <br />the construction of the recharge ponds and ancillary facilities; however, this will be confirmed prior <br />to construction. <br />11.0 INSTITUTIONAL CONSIDERATIONS <br />� <br />_ Entities that are involved in the design, construction, and financing of the project include: <br />_ Lower Latham Reservoir Company; financing and project management. <br />Lower Latham Asset Management Company; project management. <br />NoCo Engineering, Inc.; engineering, design and project management. <br />-17- <br />
The URL can be used to link to this page
Your browser does not support the video tag.