Laserfiche WebLink
L.ower Latham Reservoir Company <br />January 19, 2010 (UPDATED February 4, 2010) <br />Page 3 of 7 <br />TABLE 1 <br />W ATF.R RiGHTS <br />Agenda Item 26a <br />Appropriation Rate Decreed Water <br />Water Right Date (cfs) Use Source <br />Lower Latham 5/12/1869 20.4 Irrigation South Platte <br />Ditch <br />Lower Latham 12/12/1874 35.77 Irrigation South Platte <br />Ditch <br />Lower Latham 11/14/1877 97.68 Irrigation South Platte <br />Ditch <br />Lower Latham 10/24/1881 133.88 Irrigation South Platte <br />Ditch <br />Lower Latham 3/1/1889 35.0 Irrigation South Platte <br />Drain <br />The total imgated acreage in the Company's SWSP is 7,985.9 acres. For the 2009 plan year (April <br />2009 through March 2010), the total stream replacement obligation was determined to be 480.4 <br />acre-feet (AF). The 2009 SWSP provides augmentation water from the following sources: shares <br />of LLDC water, shares of Union Ditch Company, shares of Greeley Irrigation Company, and an <br />agreement with the City of Longmont (subject to renewal) to exchange shares of Colorado Big <br />Thompson (CBT) water owned by the Company for its municipal effluent. The 2010 SWSP <br />Renewal Request was prepa.red and submitted to the SEO in December 2009. SWSP renewals are <br />usually approved by March 31 of each year. <br />The water rights being purchased through this loan request will provide an additiona1278.8 AF of <br />consumptive use. The LLDC water is currently decreed for irrigation use. The Company has <br />applied for a change in use to include augmentation. These rights will be included in the SWSP or <br />plan for augmentation beginning in 2011. In addition, the augmentation plan application will be <br />amended to include all acquisitions, including those to be covered by the CWCB loan. <br />Project Description <br />The Company is in need of additional water rights for its plan for augmentation. It also needs either <br />reservoir storage or recharge facilities to store excess consumptive use credits from the LLDC <br />shares delivered during the summer and released during winter months to satisfy its well <br />augmentation requirements and winter return flow obligations associated with the LLDC shares. <br />The Company anticipates it will need recharge facilities or storage space capable of delivering <br />1,200 AF of water during winter months to meet the ultimate needs of the plan for augmentation. <br />The Company considered several potential alternatives for both replacement water sources for its <br />plan for augmentation and for its recharge facilities: <br />Water Rights Purchase Alternatives <br />Alternative No. la — No action: This alternative was considered unacceptable to the Company as it <br />determined that additional replacement sources are necessary to provide sufficient water during <br />extended drought periods. <br />