My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150274 contract docs
CWCB
>
Loan Projects
>
DayForward
>
1001-2000
>
C150274 contract docs
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2011 8:55:29 AM
Creation date
2/9/2010 3:50:10 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150274
Contractor Name
Yuma County Water Authority Public Improvement District
Contract Type
Loan
Water District
0
County
Yuma
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Water Rights prior to the date which is Six (6) months following the Effective <br />Date, BoRROwER shall return any portion of the Loan Amount distributed to <br />BORROWER under this loan Contract in the form of a prepayment as <br />provided for under the PROnnissoRY NoTE. <br />SECTION 7— CONSTRUCTION FUND PROGRAM PROCEDURES FOR WATER PURCHASE <br />PROJECTS. <br />A. The Borrower must submit a written purchase and sales agreement <br />for the Water Rights prior to disbursal of loan funds. <br />SECTION 8— ELIGIBLE EXPENSES FOR WATER PURCHASE PROJECTS. <br />A. Engineering associated with the feasibility report prepared as a requirement <br />for this loan and associated with evaluating the suitability of the Water <br />Rights for purchase by the BoRROwER. <br />B. Interest pending completion of the PRO�ECT pursuant to Paragraph A.4 of <br />the loan Contract. <br />C. The Loan Service Fee as provided for under the loan Contract. <br />D. Legal services for reviewing engineering services contracts and this <br />Contract. <br />E. Purchase of the Water Rights. <br />SECTION 9 — DISBURSEMENT SCHEDULE <br />For a water rights purchase, the BoRROwER shall prepare a written request for <br />funds that shall describe the upcoming closing on water rights purchase <br />including, but not limited to, the name of the seller, cost, closing date, and <br />support documentation in the form of copies of the sales agreement pursuant <br />to Section 8(A) above. After receipt of the written request from the BoRROwER, <br />and review and acceptance of the items therein as eligible expenses as <br />described above, the CWCB will pay to the BoRROwEa the amount set forth in <br />the request or such portion that has been approved by the CWCB. Such <br />payment shall be made no later than eight (8) days from the CWCB's receipt of <br />such request (subject to CWCB's approval of such request as provided for <br />above). <br />SECTION 1 O— TIME FOR PERFORMANCE <br />PRO�ECT Beginning: Upon Effective Date of this Contract (as provided for <br />and defied on the signature page of the loan Contract). <br />PRO�ECT Finish: 2 years from the Effective Date of this Contract. <br />Appendix 1 to Loan Contract C150274 <br />Page 3 of 3 <br />12368\1 \1216151 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.