Laserfiche WebLink
� Cost. An opinion of probable construction cost will be prepared based on unit costs from recent bid <br />tabulations of similar work and will include contingencies considered appropriate for this level of study <br />Costs will be based on past related dam projects performed by Boyle/AECOM. <br />Task 5 — Project Report <br />A Concepival-Level Study Report will be prepared for the Project summanzing the work completed in Tasks 2- <br />4. <br />• Reconnaissance geologic and geotechnical information and data. <br />• Two potential dam layouts, and one potential spillway and outlet works conceptual design. <br />• Project flood hydrology as it relates to the reservoir yield and water demand at a conceptual-level based <br />on the information and analyses described above. <br />• Conceptual-]evel apinion of probable conshuction costs and discussion af cost on a$/acre-foot basis will <br />also be included. <br />• Qualitative water quality discussion <br />• Qualitative discussion of water demands and likely re,�ulatory approvals <br />The repoi will also include preliminary conclusions on the feasibility of the project and a general proaess for <br />further, rnore detailed evaluations as proposed by the Study Sponsors. <br />It is anticipated that up to four conceptual-level figures will be prepared in 11 "x17" forniat for inclusion with the <br />feasibility study. <br />Three copies each of the draft and final report will be provided. An electronic copy in PDF format of the Final <br />Report will also be provided. <br />Grand Valley_Dam_Scope_3-9-09.doc - 3/16/2009 - 4 - <br />BQYLE <br />f r� �. �,Ta � �Rf? <br />� <br />