My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Southwest - Happy Scenes Water System Upgrade_Purchase Order & Scope of Work
CWCB
>
WSRF Grant & Loan Information
>
DayForward
>
SOUTHWEST & YAMPA
>
Southwest - Happy Scenes Water System Upgrade_Purchase Order & Scope of Work
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2012 12:49:28 PM
Creation date
1/21/2010 3:12:47 PM
Metadata
Fields
Template:
WSRA Grant and Loan Information
Basin Roundtable
Southwest
Applicant
Happy Scenes Water System #1, Inc.
Description
Water System Upgrade
Account Source
Basin
Board Meeting Date
11/18/2008
Contract/PO #
09000000127
WSRA - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
BUDGET <br />Provide a detailed budget by task including number of hours and rates for labor and unit costs for other direct <br />costs (i.e. mileage, $ /unit of material for construction, etc.). A detailed and perfectly balanced budget that <br />shows all costs is required for the State's contracting and purchase order processes. Sample budget tables are <br />provided below. Please note that these budget tables are examples and will need to be adapted to fit each <br />individual application. Tasks should correspond to the tasks described above. <br />Total Costs <br />Builder <br />Pump <br />Electrician <br />Matching Funds <br />Labor <br />Other Direct Costs <br />If Applicable) <br />Total Project Costs <br />Task 1 - Preperation of <br />$6,510 <br />$1,592 <br />$8,102 <br />interior of pump house for <br />Costs <br />Hourly Rate: <br />$110 <br />$130 <br />equipment <br />$85 <br />Task 2 - Purchase and <br />$4,309.50 <br />$31,910.14 <br />$36,219.64 <br />installation of pumping <br />$6,510 <br />equipment <br />Task 3- Wiring pump house <br />Inc luded <br />Included in bid <br />$7,500 <br />in bid <br />price <br />rice <br />pump house for <br />Membership contribution <br />$1,821.64 <br />1 $1,821.64 <br />equipment <br />Total Costs: <br />$51,821.64 <br />Project Personnel: <br />Builder <br />Pump <br />Electrician <br />Excavation <br />Total <br />Installer <br />Costs <br />Hourly Rate: <br />$110 <br />$130 <br />$65 <br />$85 <br />Task 1 - <br />53 hours <br />8 <br />$6,510 <br />Preperation of <br />interior of <br />pump house for <br />equipment <br />Task 2 - <br />33.15 <br />$4,309.50 <br />Purchase and <br />hours <br />installation of <br />pumping <br />equipment <br />Task 3- Wiring <br />Labor <br />pump house <br />included in <br />bid price <br />shown <br />under <br />Other <br />Direct <br />Costs <br />Total Hours: <br />53 <br />33.15 <br />Cost: <br />$5,830 <br />$4,309.50 <br />$680 <br />$10,819.50 <br />
The URL can be used to link to this page
Your browser does not support the video tag.