My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150302 feas study
CWCB
>
Loan Projects
>
DayForward
>
1001-2000
>
C150302 feas study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2011 10:08:52 AM
Creation date
12/30/2009 11:38:28 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150302
Contractor Name
WRCC, Inc.
Contract Type
Loan
County
Larimer
Weld
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
3.0 ALTERNATIVES EVALUATED <br />Several alternatives to rehabilitate/stabilize the inlet ditch were considered to compare feasibility and <br />estimated implementation costs. The alternatives were developed following a site inspection of the <br />area. <br />The alternatives considered include: <br />• Alternative 1— Existing condition Stabilization <br />�• Alternative 2— Reconstruction Along Existing Alignment �' <br />• Alternative 3— Reconstruction Along New Partial Alignment <br />• Alternative 4— New Conduit Along North Alignment <br />A brief description of the alternatives is provided below. <br />Alternative 1— Stabilization <br />• Stabilize existing inlet structures and approach ditch <br />• Cut back ditch side slopes, reclaim the side slopes and fence <br />�l- Alternative 2— Reconstr�uction Along Existing Alignment �f'�S+PCPC �'C� �4-��' �" <br />• Demolish and re-construct existing inlet and drop structures <br />. Remove rubble in inlet ditch <br />• Cut back ditch side slopes <br />• Fill areas in existing ditch channel bottom (as required) <br />• Construct new CIP concrete inlet chute (IOH:I V minimum longitudinal slope) <br />and stilling basin (on fill; final design to balance cut and fill) <br />Alternative 3— Reconstruction Along New Partial Alignment <br />Similar to Alternative 2 except on a new alignment. This will require a new inlet structure off of the <br />ditch instead of re-construction of the existing inlet structures. This alternative does not require as <br />much fill or removal of debris as Alternative 2. However, it does require the acquisition of a new <br />easement or the purchase of additional land. <br />• Construct a new CIP concrete inlet structure off of the Poudre Valley Canal. <br />• Cut back ditch side slopes, reclaim the side slopes and fence. <br />• Fill areas in the existing ditch channel bottom (as required) <br />• Construct a new CIP concrete inlet chute (approximately l OH:I V longitudinal <br />slope) and stilling basin (in cut) <br />• Construct two (2) new four (4) foot high CIP concrete ar grouted riprap drop <br />structures. <br />
The URL can be used to link to this page
Your browser does not support the video tag.