�ep 17 09 10:49a Judy <br />Table D.3 Cost Estimate, Alternative 2 <br />9702235101 p.10 <br />C ST ESTIMATE <br />PROJECT: Cobb Lake Inlet Rehabilitation DESIGN LEVEL: Feasibility PROJECT N�: 0204 <br />ITEM: Alternative IVo. 2--Chute Along Ezisting Atignment EST]MATED BY: S. RogerslJWA DATE• 9/1/2009 <br />NO DESCRIPTlON QUANTITY UNIT UNlT COST TOTAL COST <br />1 MobilizatioNdemoblllzation 1 lump sum $46,779.95 b46,780 <br />2 Sitework <br />Erosion and Sedimerrt Conirol 3,500 linear feet $2.50 $8,750 <br />Clearing and Grubbing 1.5 acres 520,000.00 S30,U00 <br />Topsoil Removal and Stockpiling 1,800 cubic yards $5.60 $10.080 <br />�e-watering 45 days $500_00 $22,5Q0 <br />Demolition of Existing Facilities 500 cubic yards $25.00 $12,500 <br />3 Inlet Structure <br />Foundation Preparation 1,000 cubicyards $4.50 $4,500 <br />Compaded Structural Fill 500 cubic yards $12.00 56,000 <br />CIP Concrete 50 cubic yards $'l,000.00 $50,000 <br />10'W x 5'H RCBC 30 linear feet $1,200.00 $36,000 <br />Decking 0 square feet $4_00 SO <br />Railing 0 finear feet 535.00 50 <br />Measuring Flume 1 lump sum $65,000.00 $65,000 <br />b Drop Inlet Structure <br />Foundation Preparation 1.000 cubic yards $4.50 S4,500 <br />Compacted 5tructural Fill 500 cubic yards $12.00 S6.000 <br />CIP Concrete 50 cubic yards $1,000.00 �50.00Q <br />5 Inlet Channel Chute/RCBC <br />Debris Removal 4,800 cubic yards $10.00 $48,000 <br />� Foundadon Preparation 200 cubic yards a4.50 3900 <br />Compacted Structural Fill 200 cubic yards $12.00 $2,400 <br />CIP Goncrete 430 cubic yarAs 51,000.00 $430,00o <br />Drain System 650 linear feet 312_50 $8,125 <br />Riprap (24-inch D�) 120 cubic yards $52.00 $6,240 <br />� Trench Excavation 0 cubicyards $6,00 $0 <br />RCBC Backfill 0 cubic yards 54.50 $0 <br />101/V x 5'H RCBC Q linear feel $'1,200.00 $0 <br />6 Inet Channel <br />CIP Concrete for Drop Structures 30 cubic yards $1,000.00 $30,000 <br />BankExcavation 2,200 cubicyards S6,00 $13,200 <br />Riprap (24-inch D�) 240 cubic yards $52.00 $12,480 <br />Riprap Bedding (6" thickness) 60 cubic yards $36.00 �2,160 <br />Compacted Fill 10,200 cubic yards $12 00 $122,400 <br />7 Feneirsg 3,OOOlinearfeet $28.00 $84,000 <br />B Reclamation 2.5 acres 57,500.00 $18,750 <br />Subtotal Construction 51,13'1,26b <br />9 Contingency (15%) 5169,690 <br />ROW ACQUISITION 0.0 acres $7,600.00 $0 <br />LAND PURCHASE 1.1 acres $15,000.00 $16,500 <br />LEGAL AND ADMINISTRATIVE FEES 1 lump sum $25,000.00 $25,000 <br />ENGINEERINGJPERMITTING/SURVEYING 'i lump sum $90,000_0� $90,000 <br />Tota) Estimated Costs 51,432,455 <br />DRAFT Cobb Lake Inlet Feasibility Costs_09 0'f 09 <br />