My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150302 feas study
CWCB
>
Loan Projects
>
DayForward
>
1001-2000
>
C150302 feas study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2011 10:08:52 AM
Creation date
12/30/2009 11:38:28 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150302
Contractor Name
WRCC, Inc.
Contract Type
Loan
County
Larimer
Weld
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Table 2 provides a summary of the estimated implementation costs for each alternative. <br />Table 2. Comparison of Estimated Im lementation Costs <br />Alternative Estimated Estimated Estimated Total <br />Construction Land/ROW Professional Implementation <br />Costs Costs Fees Costs <br />1 $1,023,000 $17,000 <br />2 $1,301,000 $17,000 <br />3 $1,560,000 $20,000 <br />4 $4,411,000 $14,000 <br />$90,000 $1,130,000 <br />$115,000 $1,433,000 <br />$115,000 $1,695,000 <br />$115,000 $4,540,000 <br />Appendix D includes a cost tabulation for the preferred alternative. <br />5.0 PERMITTING <br />The spillway channel is located entirely on private property and permanent easements are believed to <br />be in place for the portion of the project not located on ground owned by WRCC. Depending on <br />survey data, a small area of ground may need to be acquired. The adjoining landowner is willing to <br />convey land or grant additional easements if needed. We believe that Larimer County is the only <br />governtnental entity needed for permitting. <br />6.0 INSTITUTIONAL CONSIDERATIONS <br />Entities that are, or may be, involved in the design, construction and/or financing of the project <br />include: <br />WRCC, Inc. <br />John Andrew, Ph.D. P.E., Andek Consulting LLC <br />Colorado Water Conservancy Board <br />Farmers Bank of Ault <br />ARS, Inc. <br />WRCC, Inc. will be the lead for the financing, design and construction for the project and will be the <br />entity entering into contracts and agreements with the various entities for the services provided by <br />each. <br />7.0 FINANCIAL ANALYSIS <br />The entire project has an estimated cost of $1,450,000. These costs are itemized in Appendix C. <br />a.) Loan amount requested is $1,305,000 (90%). <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.