My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150302 approval ltr
CWCB
>
Loan Projects
>
DayForward
>
1001-2000
>
C150302 approval ltr
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2011 10:08:52 AM
Creation date
12/30/2009 11:09:39 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150302
Contractor Name
WRCC, Inc.
Contract Type
Loan
County
Larimer
Weld
Loan Projects - Doc Type
Approval Letter
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
WRCC, Inc. <br />November 10, 2009 (UPDATED November 19, 2009) <br />Page 5 of 5 <br />TABLE 4 <br />FINANCIAL SUMMARY <br />Agenda Item 26a <br />Past 2 Years Future <br />Financial Ratio w/ Project <br />Operating Ratio (revenues/expenses) 93% 100% <br />weak: <100% - avera e: 100% - 120% - stron : >120°/ �Weak) (Average) <br />$903K/966K $1.1M/1.1M <br />Debt Service Coverage Ratio 100% <br />(revenues-expenses)/debt service �� (Average) <br />weak: <100% - avera e: 100% - 120% - stron :>120°/ ($1,106K-966K)/ <br />149K <br />Cash Reserves to Current Expenses 518% 455% <br />weak: <50% - avera e: 50% - 100°/a - stron : >100°/ (Strong) (Strong) <br />$SM/966K $SM/1.1M <br />Annual Operating Cost per Acre-Foot (based on 35,000 AF) $2g $31 <br />� = , eak: >$20 - avera e: $10 - $20 - stron : <$1 (Weak) (Weak) <br />$966K/35K $1.1M/35K <br />*Note: Windsor Dam and Spillway Maintenance Project repayment will begin in December 2010, therefore <br />that debt service does not show up in the past two year analysis but is included in the future year analysis. <br />Collateral — As security for the loan, the Company will pledge assessment revenues. The pledge <br />shall be backed by a rate covenant. In addition, the Company will pledge its storage rights in Cobb <br />Lake as identified in Table 1. This is in compliance with CWCB Financial Policy #5 (Collateral). <br />Staff Recommendation (Board approved staff recommendation on November 18, 2009) <br />Staff recommends the Board approve a loan from the Construction Fund not to exceed $1,301,890 <br />($1,289,000 for project costs and $12,890 for the 1% Loan Service Fee) to WRCC, Inc. for <br />engineering and construction costs related to the Cobb Lake Inlet Structure Project. The loan terms <br />shall be 30 years at a blended rate of 2.85% per annum. Security for the loan shall be in compliance <br />with CWCB Financial Policy #5. <br />cc: Mayo Sommermeyer, the Dow Law Firm, LLC <br />John W. Andrew, Ph. D., P.E., Andek Consulting, LLC <br />Susan Schneider, AGO <br />Attachment: Water Project Loan Program — Project Data Sheet <br />
The URL can be used to link to this page
Your browser does not support the video tag.