Laserfiche WebLink
WRCC, jnc. <br />November 10, 2009 (UPDATED November 19, 2009) <br />Page 3 of 5 <br />TABLE 1 <br />WATF.R RifHT� <br />Agenda Item 26a <br />Appropriation Decreed Decreed Water <br />Reservoir Date <br />Storage Use Source <br />Cobb Lake July 15,1919 9,113 Irrigation Cache La Poudre <br />Cobb Lake Dec. 31, 1938 16,574 Irrigation Cache La Poudre <br />Cobb Lake Dec. 31, 1938 20,432 Irrigation Cache La Poudre <br />Project Description <br />Four alternatives to stabilize the inlet ditch were considered. <br />Alternative No. 1- Existing condition stabilization: This alternative would stabilize the existing <br />inlet ditch by cutting back the ditch side slopes and a fence would be added. The estimated cost of <br />this alternative is $1,130,000. <br />Selected Alternative No. 2— Reconstruction along existing alignment: This alternative would <br />include demolishing and re-constructing the existing inlet and drop structures, removing the rubble <br />in the inlet ditch, cutting back the side slopes to be less steep, filling in areas in the existing channel <br />bottom, constructing a new cast-in-place concrete inlet chute and stilling basin, and the acquisition <br />of land to widen the existing easement. The estimated cost of this alternative is $1,433,000. <br />Alternative No. 3— Reconstruction along new alignment: This alternative is sirnilar to Alternative <br />No. 2 except along a new alignment. It would require a new inlet structure off the ditch rather than <br />reconstructing the existing structures. It would not require as much fill or removal of debris, but <br />would require the acquisition of a new easement and/or the purchase of additional land. The <br />estimated cost of this alternative is $1,695,000. <br />Alternative No. 4— New conduit along new alignment: This alternative would consist of a new <br />inlet structure and conduit along an alignment to the north of the existing alignment. This <br />alternative would also require the acquisition of a new easement and/or land purchase. The <br />estimated cost of this alternative is $4,540,000. <br />Alternative No. 2, reconstruction along the existing alignment, was selected because it addresses the <br />Company's safety concerns regarding the degradation of the ditch in a cost effective manner, with <br />less maintenance than Alternative No. 1. <br />Construction of the Project is expected to begin in early 2010 with completion by May 2010. Table <br />2 shows the estimated Project costs. <br />