My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C153567 contract docs
CWCB
>
Loan Projects
>
DayForward
>
1001-2000
>
C153567 contract docs
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/19/2010 12:54:54 PM
Creation date
12/30/2009 10:28:00 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153567
Contractor Name
Grand Junction, City of
Contract Type
Loan
Water District
72
County
Mesa
Bill Number
SB 89-85
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
� � <br />� <br />Section 2. Securitv. As security for the loan to be made by <br />the State, the City of Grand Junction, Colorado, will execute <br />a warranty deed within thirty (30) days of the first advance <br />of funds from the State which will convey to the State an un- <br />divided fifty percent (50�) interest in 5866 feet of 24 inch <br />diameter Plastic Irrigation Pipe, 100PSI, SDR 41, inclusive <br />of all intake structures, incidentals, and appurtances, the <br />pipe to be laid between the North Fork of Kannah Creek exist- <br />ing diversion structure and Purdy Mesa and Juniata Reser- <br />voirs. <br />Section 3. Assurance. The City will provide revenues in the <br />City water fund to insure that the North Fork Diversion Pipe- <br />line is maintained and operated in good working order, as se- <br />curity to the State and the City for their interests in the <br />pipeline until, at least, the total loan obligation to the <br />Colorado Water Conservation Board is discharged. In addition <br />the City's obligation for repayment will not terminate upon <br />loss of the pipeline as a result of fire or other hazards. <br />Section 4. Utilitv Rates. The City of Grand Junction peri- <br />odically sets rates for the operation and expansion of its <br />water utility operation. The City agrees that it will main- <br />tain rates sufficient to pay the annual indebtedness on the <br />loan and to maintain the pipelin d working order as <br />outlined in Section 3. Thes"� �+�r1 , are established and <br />set aside in the Water Fund a e�aY� separ e and apart from <br />Cit General Fund revenues. he � he Fund balance <br />Y �? � �� <br />of the Water Fund, not to e d`]���a]� rincipal and in- <br />terest payment of this not ' 1 e'�estricted for the sole <br />purpose of discharging the ' y s loan obligation and the <br />State of Colorado will have conveyed to it a security inter- <br />est in these restricted revenues to secure repayment of the <br />debt. <br />Section 5. Default In the event of default in the repayment <br />of the debt to the 5tate and upon written notice from the <br />State, the City , pursuant to its Charter, will take all nec- <br />essary actions to levy any additional assessments to cure the <br />default. <br />Section 6. Sale and Transfer. The City agrees that it will <br />not sell, convey, assign, grant, transfer, mortgage, pledge, <br />encumber, or otherwise dispose of the project or any portion <br />there of so long as the annual installment required by the <br />note remain unpaid, without the prior written occurrence of <br />the State. <br />Section 7. Repealer. All acts, orders, resolutions, ordi- <br />nances, or parts thereof, of the City that are inconsistent <br />or in conflict with this resolution are hereby repealed to <br />
The URL can be used to link to this page
Your browser does not support the video tag.