My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150301 feas study
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
C150301 feas study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/22/2015 9:57:47 AM
Creation date
12/28/2009 3:24:01 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
CT2015-050
C150301
Contractor Name
Riverside Ditch and Allen Extension Company, The
Contract Type
Loan
Water District
11
County
Chaffee
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Conclusions and Recommendations <br />The following conclusions have been formulated as a part of preparing this feasibility <br />study: <br />1) The Riverside Ditch & Allen Extension Company is an incorporated entity in <br />the State of Colorado with the ability to enter into a contract with CWCB for <br />the purpose of obtaining a Construction Fund loan. <br />2) <br />3) <br />4) <br />5) <br />6) <br />Existing rights-of-way and easements are adequate for the construction of <br />this project. <br />The project will provide for the continued delivery of irrigation water to <br />shareholders. <br />This project will result in the ability of the Company to divert their full decree. <br />The total estimated cost of the project is $204,000 and this will be financed <br />(90%) by an anticipated loan from the CWCB. <br />The project is technically and financially feasible. <br />Aqua Engineering, Inc. Riverside Ditch & Allen Extension Co., Feasibility Study <br />October 2009 - 10 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.