My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150296 Feasibility Study
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
C150296 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2015 12:05:01 PM
Creation date
10/27/2009 10:29:05 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
CT2015-058
C150296
Contractor Name
Gypsum, Town of
Contract Type
Loan
Water District
0
County
Eagle
Loan Projects - Doc Type
Feasibility Study
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
523
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Gypsum Loan Feasibility Outline <br />CWCB Water Project Loan Program <br />Page 28 of 33 <br />2.4.4 Implementation Schedule <br />To follow is the proposed schedule for the project implementation. <br />Project component description Beginning Date Projected Completion <br /> Date <br />2009 <br />Improve LEDE Middle Section of Ditch to 30": Spring, Summer 2009 Fa112009 <br />• Notify Forest Service regarding ditch <br />improvement <br />• Estimate Cubic Feet per second flow rates <br />(30-45 cfs) <br />• Design of Pipeline <br />• Preparation of Bid Documents <br />• Publication of Bid Document and LEDE <br />Pipeline Construction Requirements <br />• Construct Pipeline LEDE <br />Review Out of Basin and In Basin Hydrology for Spring, Summer 2009 Fa112009 <br />Reservoir (Basin Yield) <br />• Antones Creek <br />• LEDE Reservoir <br />Hazazd Classification Study Spring, Summer 2009 Fa112009 <br />• Dam Hydrology / PMF Review <br />• Routing Study <br />• Dam Classification (Possibility of Lower <br />Classification) <br />Collection and Review of Soils Data S ring, Summer 2009 Fa112009 <br />2010 <br />Assess United States Forest Service Requirements Fa112009-December December 2010 <br />• Special Use Permit Boundaries 2010 <br />• Potential Environmental Assessment <br />• Biological Assessment <br />• Wildlife Study <br />• Potential Environmental Im act Statement <br />Eagle County Requirements Spring - Summer 2010 Fa112010 <br />• Grading Permit <br />• 1041 Review of Altematives <br />United States Army CORPS of Engineers Spring - Summer 2010 December 2010 <br />• 404 Permit <br />Colorado Dam Safety Review Sprin - Summer 2010 December 2010 <br />Water Ri ts Review S ring - Summer 2010 Fa112010 <br />Preliminary Dam Desi Summer 2010 December 2010 <br />2011 <br />Bid Dam Winter 2011 <br />• Design of Dam <br />• Preparation of Bid Documents <br />• Publication of Bid Document and LEDE <br />Reservoir Construction Re uirements <br />Begin Dam Construction 2011 2011 <br />
The URL can be used to link to this page
Your browser does not support the video tag.