Laserfiche WebLink
Gypsum Loan Feasibility Outline <br />CWCB Water Project Loan Program <br />Page l9 of 33 <br />wintertime diversion of about 5.83 cfs, with summertime diversion requirements far <br />exceeding that figure. <br />In addition, pursuant to the Town's purchase agreement for the LEDE Reservoir water <br />rights, it must be in a position to supply 100 acre-feet to the seller for irrigation. This <br />contractual agreement is for irrigation in addition to the irrigation currently supplied by <br />the town for various outdoor irrigation needs. <br />