My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150296 Feasibility Study
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
C150296 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2015 12:05:01 PM
Creation date
10/27/2009 10:29:05 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
CT2015-058
C150296
Contractor Name
Gypsum, Town of
Contract Type
Loan
Water District
0
County
Eagle
Loan Projects - Doc Type
Feasibility Study
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
523
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Gypsum Loan Feasibility Outline <br />CWCB Water Project Loan Program <br />Page l9 of 33 <br />wintertime diversion of about 5.83 cfs, with summertime diversion requirements far <br />exceeding that figure. <br />In addition, pursuant to the Town's purchase agreement for the LEDE Reservoir water <br />rights, it must be in a position to supply 100 acre-feet to the seller for irrigation. This <br />contractual agreement is for irrigation in addition to the irrigation currently supplied by <br />the town for various outdoor irrigation needs. <br />
The URL can be used to link to this page
Your browser does not support the video tag.