My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150296 Approval letter
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
C150296 Approval letter
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2015 12:05:01 PM
Creation date
10/27/2009 10:29:04 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
CT2015-058
C150296
Contractor Name
Gypsum, Town of
Contract Type
Loan
Water District
0
County
Eagle
Loan Projects - Doc Type
Approval Letter
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Town of Gypsum <br />May 12, 2009 (UPDATED May 22, 2009) <br />Page 4 of 6 <br />Agenda Item 17a <br />repairs and 1,900 feet of new pipe. Construction estimate for the Ditch improvements is $342,000. <br />Alternative No. 1- No Action - This option is not considered viable since the existing dam and <br />spillway do not meet current dam safety regulations. There would likely be significant loss in storage <br />capacity, if a SEO restriction were placed on the reservoir water level. The Ditch would continue to <br />periodically overtop and ditch failures would occur causing erosion on the hillside below. <br />Alternative No. 2- Repair and rehabilitate the existing dam - This alternative would not increase <br />capacity of the dam; however, it would avoid a potential future SEO restriction. This alternative does <br />not assist with the Town's long term goals for meeting existing and growing water needs. <br />Construction estimate for the dam is $2,150,000 for a total of $2,500,000. <br />Alternative No. 3(SELECTED) - Repair and enlarge dam (685 AF) - This alternative will <br />maximize storage and maintain current SEO rating of the dam. The dam's height could be raised 9.5 <br />feet, to 49 feet. This would raise the crest height of the dam 14.5 feet with the crest width extended to <br />20 feet. Approximately 254 AF of additional storage (685 AF total) would be added to the reservoir. <br />The outlet pipe would be replaced and the spillway modified. Construction estimate for the dam is <br />$2,820,000 for a total of $3,162,000. <br />Alternative No. 4- Repair and enlarge dam (947 AF) - This alternative will increase storage to the <br />decreed capacity with a dam height increase of 19.5 ft and the crest height 24.5 ft. The dam height <br />would be approximately 59 ft(69 ft total). This alternative requires an increase in several dam safety <br />components and therefore is not cost beneficial. Construction estimate for the dam is $3,653,000 for a <br />total of $3,995,000. <br />Project Cost Estimate <br />LEDE Ditch Construction <br />Engineering/Permitting/Mitigation/Legal $122,000 <br />Construction $183,000 <br />Construction Contingency (20%) $37,000 <br />Subtotal $342,000 <br />LEDE Reservoir Construction <br />Engineering/Permitting/Mitigation/Legal $820,000 <br />Construction $1,667,000 <br />Construction Contingency (20%) $333,000 <br />Subtotal $2,820,000 <br />Total $3,162,000 <br />The cost of the enlargement portion for the Project would be $11,100/AF for the 254 AF of <br />enlargement. Design and permitting is expected to occur in 2009/2010 with pipeline construction <br />starting in late 2009 and dam construction starting in 2011. <br />
The URL can be used to link to this page
Your browser does not support the video tag.