My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJC02548
CWCB
>
Loan Projects
>
DayForward
>
1001-2000
>
PROJC02548
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:18:13 AM
Creation date
10/14/2009 1:18:59 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153375
Contractor Name
Canon City, City of
Contract Type
Loan
Water District
12
County
Fremont
Bill Number
SB 81-439
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
.' ~ ~ <br />SCHEDULE A <br />COLORADO WATER CONSERVATION BOARD <br />CONSTRUCTION FUND PROGRAM PROCEDURES <br />1. Board approval ot engineering tirm and engineering <br />agreement between engineering tirm and pro~ect sponsor. <br />2~ authorizednpro~ectsibydconsultfng engincering~tirm~r <br />3. Approval ot detailed plans and specitications by Board <br />statt (plans and speciticatiovedfbr State9Engineer'~s <br />reservoirs must also be app Y <br />ottice). <br />4. 8oard statt approval ot bidding for the project. Board , <br />staft present at bid opening Por construction. <br />~ tice of award and the <br />5. Pro~eet sponsor may i e ion to the contractor <br />notice' to proceed Nith~ <br />(both notices must be ~p roved b~e Board staft before <br />they are issued). ~~ <br />6. Conduct a pre-const~o~conPerence. Approval of <br />construetion schedule by Board staff. <br />7. Construction commences. The Board staff makes periodic <br />inspections during construction. All change orders must <br />be approved by the Board staff in advance and before any <br />construction on change items can commence. Emergency <br />items cleared by telephone. <br />9. The consulting engineer certiPies that the pro~ect has <br />been completed according to approved drawings and <br />specitications and arranges for final inspection. . <br />9. Final inspection and acceptance of as-built project by <br />Board staPf: • <br />10. Submittal of as-built drawings to Board staff for <br />approval and Piling. ' <br />Pag^e 8 of 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.