My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150300 Feasibility Study
CWCB
>
Loan Projects
>
DayForward
>
1001-2000
>
C150300 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/29/2011 8:29:58 AM
Creation date
10/14/2009 1:18:42 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150300
Contractor Name
Raymond Dairy, Inc.
Contract Type
Loan
Water District
0
County
Mesa
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CWCB Construction Fund Loan Application <br />6. Will the acquisition of additional water rights be necessary? YES �N�O�. <br />If YES, please explain. <br />�,. <br />7. Please list the names, addresses and phone numbers of the Applicants' engineer(s) and <br />attorney(s). <br />NAME ADDRESS and PHONE <br />; ��>�,_ „ <br />� �'d ( � ?Ta-Y�� �_ a � ¢s �� 1 ` :,; � `/a �'-f.�`�'r ? �' ` ,' l �/J��.> ���_C1-S �' � , �t'1 —�'' 'r""a �,� �i� 7 �� �, ;!t `` f <br />X //D <br />�'�s�1K�,t' �#n� i �r'r.�f'lt (-��'�t.�/�:.� F���� �i� _ � ���°��� �� l `�7 <br />8. List any feasibility studies or other investigations that have been completed or are now in <br />P �T P k� G .p J �r,,�� 1 ;�� , (�� ��� � �� � ���t%�..�`y���,��`���14.. <br />ro ess for the ro osed ro ect Please submit one co o each co leted stud wi t is <br />application. �,�� i �� �� � �� ��< �� ,, f�" �3 .�, �;.� �`rr��°t . <br />� <br />9. Estimated cost of the project. Please include estimated engineering costs, and estimat�l <br />construction costs, if known. <br />Estimated Engineerin$ Costs: <br />Estimated Construction Costs: <br />$ �� ���;�� <br />� , <br />Estimated Other Costs: $� �iaaa a�yUiS�cion, water rights purchase,etc.) <br />Estimated Tot�l Costs: $ �� i �� � <br />10. Loan amount and terms you are requesting. <br />Requested Loan Amount: $ �'� �..,� � � <br />Term (length) of loan: �-� y�s <br />�t1tel'eSt �,te: °�` " � % <br />Part C. - Project Sponsor Financial Information <br />(Maximum 75-90 % of Fst. Total Costs) <br />(LTsually 10, 20, or 30 yeazs) <br />(Please call for our current rates) <br />Because the CWCB Construction Fund is a revolving fund, it is important that the project sponsor <br />have the �nancial capacity to repay any loans made by the CWCB. The following information is <br />needed to assist the CWCB in a preliminary assessment of the applicant's financial capacity. It is <br />also requested that the project sponsor submit with this application, copies af the three most recent <br />annual reports, financial statements, corporate reports or other current documentation of fmancial <br />condition and operations. <br />� <br />
The URL can be used to link to this page
Your browser does not support the video tag.