My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150300 Approval Letter
CWCB
>
Loan Projects
>
DayForward
>
1001-2000
>
C150300 Approval Letter
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/29/2011 8:29:58 AM
Creation date
10/14/2009 1:18:40 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150300
Contractor Name
Raymond Dairy, Inc.
Contract Type
Loan
Water District
0
County
Mesa
Loan Projects - Doc Type
Approval Letter
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Raymond Dairy, Inc. <br />September 9, 2009 (UPDATED September 16, 2009) <br />Page 3 of 5 <br />Project Description <br />Two alternatives were analyzed in the feasibility study: <br />1) No action alternative; <br />2) Participate in the NRCS Colorado River Basin Salinity Control Program. <br />Agenda Item 7c <br />The Borrower chose to participate in the Salinity Control Program because of the funding assistance <br />and engineering services provided by the NRCS. Work to be completed consists of replacing <br />2,400 feet of the Ditch, and installing new head gates and punch plates. The benefits of this Project <br />include decreased amounts of seepage in the Ditch (thus decreasing the amount of salt that leaches <br />into the Colorado River), increased efficiency of water flow, and reduction of the amount of debris <br />in the water. <br />Construction is scheduled to begin in November 2009 and is expected to be complete by April <br />2010. <br />Financial Analysis <br />Table 1 shows a summary of the funding sources for the Project. The total estimated cost of the <br />Project is $95,000. An initial loan phase (during construction) amount is based on 100% of the <br />estimated total Project cost (allowed per Policy #11). The loan will be reduced to $63,000 after the <br />Project is complete and the Borrower receives funds from the NRCS. <br />Table 1. Project Funding Sources <br />Funding Source Grant/Other Loan <br />Initial Loan Phase <br />CWCB Loan $95,000 <br />Total $95,000) $0 $95,000 <br />Post Construction Phase <br />Borrower (NRCS-Cost Share)* $32,000 <br />CWCB Loan $63,000 <br />Total ($95,000) $32,000 $63,000 <br />* Received after construction is complete from Nxc.;~ <br />Table 2 shows a summary of the financial aspects of the Project. <br />
The URL can be used to link to this page
Your browser does not support the video tag.