My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150300 Approval Letter
CWCB
>
Loan Projects
>
DayForward
>
1001-2000
>
C150300 Approval Letter
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/29/2011 8:29:58 AM
Creation date
10/14/2009 1:18:40 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150300
Contractor Name
Raymond Dairy, Inc.
Contract Type
Loan
Water District
0
County
Mesa
Loan Projects - Doc Type
Approval Letter
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
STATE OF COLORADO <br />Colorado Water Conservation Board <br />Department of Natural Resources <br />i 313 Sherman Street, Room 721 <br />Demer, Colorado 80203 <br />Phone:(303)866-3441 <br />Fax:(303)866-4474 <br />www.cwcb.state.co.us <br />Bill Ritter, Jr. <br />Governor <br />TO: Colorado Water Conservation Board Members Harris D. Shernian <br />G~~~ DNR Executive Director <br />FROM: Anna Mauss, P.E. Jennifer L. Gimbel <br />Water Supply Planning & Finance Section CWCB Director <br />Dan McAuliffe <br />DATE: September 9, 2009 (UPDATED September 16, 2009) CWCB Deputy Director <br />SUBJECT: Agenda Item 7c, September 15-16, 2009 Board Meeting <br />Water Supply Planning and Finance Section - New Project Loans <br />Raymond Dairy, Inc. - Raymond Ditch Reconstruction Project <br />Introduction <br />The Raymond Dairy, Inc. (Borrower) has requested a loan from the CWCB to replace approximately <br />2,400 feet of its existing concrete ditch for the Raymond Ditch Reconstruction Project (Project). The <br />Project will increase ditch efficiency and reduce salinity impacts in the Colorado River. The total <br />Project cost, including engineering and construction, is estimated at $95,000. The Borrower is eligible <br />to receive funding assistance from Natural Resources Conservation Service (NRCS). The remaining <br />project cost will become a 20-year CWCB loan. See attached Project Data Sheet for a location map <br />and Project summary. <br />Staff Recommendation (Board approved staff recommendation September 15, 2009) <br />Staff recommends the Board approve a loan, not to exceed $95,950 ($95,000 for project costs and <br />$950 for the 1% Loan Service Fee) for engineering and construction costs, to Raymond Dairy, Inc. <br />from the Construction Fund for the Raymond Ditch Reconstruction Project. Following construction, <br />the staff further recommends the loan be amended to an amount not to exceed $63,950 ($63,000 for <br />the remaining balance of the Project and $950 for the Loan Service Fee). The loan terms shall be <br />20 years at the reduced agricultural rate of 2.5% per annum (2.75% reduced by 0.25% for a 20-year <br />term). Security for the loan shall be in compliance with CWCB Financial Policy #5. <br />Staff further recommends that no loan funds be disbursed until an account is set up with one annual <br />payment is set aside as the reserve account. <br />Water Supply Protection • Watershed Protection & Flood Mitigation • Stream & Lake Protection • Water Supply Planning & Finance <br />Water Conservation & Drought Planning • lntrastate Water Management & Development <br />
The URL can be used to link to this page
Your browser does not support the video tag.