Laserfiche WebLink
FEASIBILITY STUDY <br />FOR <br />REHABILITATION <br />OF <br />SOUTH GRAY RESERVOIR & GRAY RESERVOIR NO. 3 <br />OWNED BY <br />LAKE CANAL RESERVOIR COMPANY <br />P.O. BOX 104 <br />Lucerne, Colorado 80646 <br />PREPARED BY <br />SMITH GEOTECHNICAL ENGINEERING, INC. <br />1225 RED CEDAR CIRCLE, SUITE H <br />FORT COLLINS, COLORADO 80524 <br />Sponsored by the <br />Lake Canal Reservoir Company <br />in conjunction with the <br />Colorado Water Conservation Board <br />August 3, 2009 <br />Project No. 2009.016 <br />