My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150299 Approval leter
CWCB
>
Loan Projects
>
DayForward
>
1001-2000
>
C150299 Approval leter
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/12/2011 3:14:22 PM
Creation date
10/14/2009 1:17:50 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150299
Contractor Name
Lake Canal Reservoir Company
Contract Type
Loan
Water District
0
County
Larimer
Weld
Loan Projects - Doc Type
Approval Letter
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
STATE OF COLORADO <br />Colorado Water Conservation Board <br />Department of Natural Resources <br />1313 Shemian Street, Room 721 <br />Denver, Colarado 80203 <br />Phone:(303)866-3441 <br />Fax:(303)866-4474 <br />www.cwcb.state.co.us <br /> Bill Ritter, Jr. <br /> Governor <br />TO: Colorado Water Conservarion Board Members <br /> Harris D. Sherman <br />~ <br />k R <br />ll <br />PE ~Gl <br />FROM <br />Ki DNR Executive Director <br />usse <br />~ <br />, <br />r <br />: <br />WateT Supply Planning & Finance Section <br />cwcs rn~~ ~ <br />DATE: September 9, 2009 PDATED Se tember 16, 2009 <br />~ ~1 ~ Dan McAuliffe <br />CWCB Deputy Director <br />SUBJECT: Agenda Item 7b September 15-16, 2009 Board Meeting <br />Water Supply Planning and Finance Section - New Project Loans <br />Lake Canal Reservoir Company - South Gray Reservoir Rehabilitation & Gray <br />No. 3 Breach <br />Introduction <br />The Lake Canal Reservoir Company (Reservoir Company) is applying for a loan for the South Gray <br />Reservoir Rehabilitation & Gray No. 3 Breach Project (Project). The Project includes: 1) installation <br />of toe drains on the South Gray dam to collect excessive seepage as required by the SEO Dam <br />Safety Branch and avoid reservoir restrictions; and 2) breaching of Gray Reservoir No. 3 dam. The <br />total cost estimate for the Project is $433,000. The Project will address SEO Dam Safety hazazd <br />concerns and maintain full use of the Company's storage rights. The loan request is for <br />approximately 90% of the Project costs. See attached Project Data Sheet for a location map and <br />summary. <br />Staff Recommendation (Board approved Staff Recommendation on September 16, 2009) <br />Staff recommends the Board approve a loan not to exceed $393,900 ($390,000 for project costs and <br />$3,900 for the 1% Loan Service Fee) to the Lake Canal Reservoir Company for the South Crray <br />Reservoir Rehabilitation & Gray No. 3 Breach from the Construction Fund. The loan terms shall be <br />an interest rate of 3.15% per annum for 30 years. Security for the loan shall be in compliance with <br />CWCB Financial Policy #5. <br />Background <br />South Gray Reservoir dam has excessive seepage along a major portion of the dam. In an effort to <br />preserve the storage right on this reservoir, the Reservoir Company is adding a toe drain or other <br />seepage measures to ensure the safety of the dam. <br />Water Supply Protection • Wntershed Protection & Flood MiNgation • Stresm & Lake Protection • Water Supply Planning & Finance <br />Water Conservation & Drought Plaoning • Intrastete Water Mxnagement & Development <br />
The URL can be used to link to this page
Your browser does not support the video tag.