My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150298 Approval Letter
CWCB
>
Loan Projects
>
DayForward
>
1001-2000
>
C150298 Approval Letter
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/12/2011 3:14:04 PM
Creation date
10/14/2009 1:17:26 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150298
Contractor Name
Fort Morgan Reservoir and Irrigation Company
Contract Type
Loan
Water District
0
County
Morgan
Loan Projects - Doc Type
Approval Letter
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CWCB Construction Loan Program <br />Project Data Sheet <br />Borrower: Fort Morgan Res. & Irrigation Co. <br />Project Name: Pipeline Project <br />Drainage Basin: South Platte <br />County: Morgan <br />Project Type: Augmentation/Pipeline Const. <br />Water Source(s): South Platte River <br />Total Project Cost: $2,388,500 Funding Sources: Construction Fund <br />Type of Borrower: Blended (Ag & Municipal Average Diversions: 37,058 AF <br />& Commercial) <br />Loan Amount: Q' ,°~°,~ $1,494,800 (Including 1% fee) Interest Rate: 2.9% Term: 30 years <br />The Company operates a ditch system that serves surface water to approximately 15,000 acres of <br />irrigated land between Weldona and Brush, and operates a recharge and augmentation plan that <br />provides augmentation water for approximately 90 irrigation wells. In addition, the Company has <br />an operational agreement with Groves Farms, LLC, which is a family farming corporation also <br />located in Morgan County, for a recharge/augmentation plan. The Company, with Groves Farms, <br />has designed a plan to re-divert and re-time augmentation credits from the Company's more senior <br />recharge projects at certain times when they are not needed for direct augmentation use, and to <br />divert water under new junior water rights when available for recharge and augmentation use. The <br />Project involves installing one 24" pipe from the River extending three miles to recharge ponds on <br />Groves Farms' land; installing two pumps to pump water from the River through the pipeline; <br />installing one augmentation well and pumping equipment near Groves' ponds to pump ground <br />water back to the South Platte River; and installing seven recharge/augmentation ponds (with a <br />surface area of approximately 95 acres) on Groves Farms' land. The Project will be completed <br />within 12-18 months after loan approval. <br />LOCATION MAP <br />
The URL can be used to link to this page
Your browser does not support the video tag.