My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150298 Approval Letter
CWCB
>
Loan Projects
>
DayForward
>
1001-2000
>
C150298 Approval Letter
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/12/2011 3:14:04 PM
Creation date
10/14/2009 1:17:26 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150298
Contractor Name
Fort Morgan Reservoir and Irrigation Company
Contract Type
Loan
Water District
0
County
Morgan
Loan Projects - Doc Type
Approval Letter
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Fort Morgan Reservoir and Irrigation Company <br />September 9, 2009 (UPDATED September 16, 2009) <br />Page 4 of 6 <br />Agenda Item 7a <br />Alternative No. 3(Selected Alternative) was selected because the Company determined that by <br />building a pipeline and recharge ponds, it could meet its goal of returning water to the South <br />Platte River to meet augmentation requirements. After review of different locations for a <br />possible pipeline project, the selected location was determined to be ideal due to property <br />ownership, land topography and land characteristics, and the ability to re-divert excess credits. It <br />was also the most economically feasible option. <br />The Project involves installing one 24" pipe from the South Platte River extending three miles to <br />recharge ponds on Groves Farms' land; installing two pumps to pump water from the river <br />through the pipeline; installing one augmentation well and pumping equipment near Groves' <br />ponds to pump water back to the river; and installing seven recharge/augmentation ponds (with a <br />surface area of approximately 95 acres) on Groves Farms' land. This system will allow the <br />Company to recapture and re-time the Company's excess augmentation credits that accrue to the <br />South Platte River. Through the new pipeline, new junior diversions may be made and delivered <br />to these new ponds on the Groves Farms' property. These junior diversions will produce <br />augmentation credits that will accrue to the South Platte River and may be used immediately for <br />augmentation or may be re-timed. <br />The Company will likely re-time water between November and March. Groves Farms will use <br />the Project at different times when there is no ca11 on the South Platte River or when freezing <br />weather removes calls because senior ditches cannot divert. <br />The Company has decrees for its augmentation plan and is seeking decrees for additional <br />recharge water rights. Groves Fatms is seeking a decree for junior water rights and the <br />augmentation plan that it operates. <br />Pending loan approval, the Project will be completed within 12-18 months. The Company <br />estimates that final design will be complete within 90 days, pipeline construction will be <br />complete within 150-200 days, river pump equipment installation and testing will be complete <br />within 90 days, augmentation well and pump installation will be complete within 60 days, pond <br />construction within 100 days, and final survey complete within 220 days. Some of the work will <br />be completed simultaneously; so the total construction period is 220 days. <br />TABLE 1 <br />PROJECT COST <br />Construction $ 2,036,500 <br />En ineerin $ 175,000 <br />Contin enc $ 177,000 <br />TOTAL $ 2,388,500 <br />
The URL can be used to link to this page
Your browser does not support the video tag.