Laserfiche WebLink
~ <br />Town of Dillon <br />Old Dillon Reservoir Enlargement Project <br />May 26, 2009 <br />Page 2 of 2 <br />funding contracts for the Reservoir's construction prior to the Town of Dillon receiving <br />CWCB loan disbursements. <br />C) Design/Construction: You must adhere to the CWCB Design and Construction Administration <br />Procedures. Tim Feehan will contact you regarding this phase of the process. Tim will make <br />construction site visits, which will be the basis of pay estimates for disbursement of your loan <br />funds. You can contact Tim at his desk at (303) 866-3441 x 3211 or cell phone (303) 618- <br />5010. <br />On behalf of the Board, I would like to thank you for your interest in a loan from the Colorado Water <br />Conservation Board. <br />Sincerely, <br />~~~~ <br />_1~~~ <br />Mike Serlet, P.E., Chief <br />Water Supply Planning and Finance Section <br />Colorado Water Conservation Board <br />Attachment: Updated Board Memo <br />E-mail Copy (Including Attachments) <br />~ <br />Kirk Russell, P.E. <br />Water Supply Planning and Finance Section <br />Colorado Water Conservation Board <br />John Redifer, Board Member - Colorado Mainstem River Basin <br />Eric Holgerson, Town of Dillon, Public Works Director <br />Ray Tenney, Colorado River Water Conservation District <br />Susan Schneider, AGO <br />CWCB Finance Section Staff <br />