My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150294 Feasibility Study
CWCB
>
Loan Projects
>
DayForward
>
1001-2000
>
C150294 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:26:00 AM
Creation date
10/14/2009 1:07:51 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150294
Contractor Name
Snowmass Water & Sanitation District
Contract Type
Loan
Water District
0
County
Pitkin
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
169
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CWCB Construction ~nd Loan Application <br />6. Will the acquisition of additional water rights be necessary? YES <br />ff YES, please explain. <br />NO X <br />7. Please list the names, addresses and phone numbers of the Applicants' engineer(s) and <br />attomey(s). <br />NAME <br />ADDRESS and PHONE <br />Ron McLaughlin McLaughlin Water En~neers. Ltd., 230015th Street, Suite 120 <br />Tim McLau~hlin Denver. Co. 80202 Phone-303-4~64-3333 <br />Mark Hamitton Holland & Hart. 600 E. Main S~. Suite 104. Aspen Co. 81611 <br />Phane-970-925-3476 <br />8. List any feasibility studies or other investigations that have been cornpleted or are now in <br />progress for the proposed project. Please submit one copy of each completed study with this <br />application. ~'he Loan Feasibilitv Studv is included. ~ <br />9. Estimated cost of the project. Please include estimated engineering costs, and estimated <br />construction costs, if known. <br />Estimated Engineering Costs: $ 180.000 <br />Esdmated Construction Costs: $ 1.627.000 <br />Estimated Other Costs: $ ~2.~ ~(land acquisiaort, water rights purchase,etc.) <br />Estimated Total Costs: $ 2,149.000 <br />10. Loan amount and terms you are requesting. <br />Requested Loan Amount: $ 1.934.000 (Maximum 75-90 ~ of Fst. Total Costs) <br />Term (length) of laan: 20 ,~ (u~ty to, 20, or 30 years) <br />Interest Rate: 4.25 % (Please cal] for our current rates) <br />Part C. - Projec~ Sponsor Financial Informatioa <br />Because the CWCB Construction Fund is a revolving fund, it is unportant that the project sponsor <br />have the financial capacity to repay any loans made by the CWCB. The following infomiatian is <br />~needed to assist the CWCB in a preliminary assessment of the applicant's financial capacity. It is <br />also requested that the project sponsor submit with this application, copies of the thr~ most recent <br />annual reports, financial statements, corpQrate reports or other cuirent documentation of fuaancial <br />condition and operations. <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.