My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150294 Feasibility Study
CWCB
>
Loan Projects
>
DayForward
>
1001-2000
>
C150294 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:26:00 AM
Creation date
10/14/2009 1:07:51 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150294
Contractor Name
Snowmass Water & Sanitation District
Contract Type
Loan
Water District
0
County
Pitkin
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
169
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
~ <br />LJ <br />I~J <br />~J <br />MODEL DESCRIPTION <br />, <br />A computer-based water suppiy and system analysis model of the District was <br />~ prepared to evaluate the study's objectives. The model consists of two separate <br />modules. The first module is a Supply Side modef which models water that is physicaily <br />~ and legally available. This model is focused primarily on East Snowmass Creek and <br />Snowmass Creek, which is the primary dry-year supply for the District simply because <br />, the avaifable water supp(ies in the Brush Creek drainage are minimal in the dry years. <br />The second module is a Demand Side model that determines the Snowmass Creek <br />~ diversions based on the District demands and the DistricYs Stream Flow Stewardship <br />Goai for supporting a minimum flow level in Snowmass Creek. The Demand Side <br />module uses the results from the Supply Side model as the water availability and stream <br />~ impact boundary, and evaluates raw water storage requirements to meet these demands <br />and goals. <br />~ <br />The Supply Side model explicitly operates the East Snowmass Creek and the <br />~ main stem Snowmass Creek decreed water rights in a water balance format, assuming <br />strict priority of diversions for water rights, and determining the legal and physical <br />, availability of water under the District's water rights. The Supply Side model, as well the <br />Demand Side model, use the 1977 and 2002 - 2003 droughts as representative <br />extremely dry periods for anaiysis. The Supply Side model is operated on a daily basis <br />, for the periods of interest, extending from June 1976 through July 1978 and January <br />2002 through September 2004. The droughts of 1977 and 2002 are the first and second <br />~ driest periods in the past 100 years, respectively, in terms of monthly flow of the Roaring <br />Fork River at Glenwood Springs stream gaging station. <br />~ <br />~ <br />~ <br />~ <br />Page 4 <br />~~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.