My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150294 Feasibility Study
CWCB
>
Loan Projects
>
DayForward
>
1001-2000
>
C150294 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:26:00 AM
Creation date
10/14/2009 1:07:51 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150294
Contractor Name
Snowmass Water & Sanitation District
Contract Type
Loan
Water District
0
County
Pitkin
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
169
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
The primary sources of revenue that will be used for repayment are Service Fees and <br />System Development Fees. Net Investment income and other miscellaneous revenue <br />are also available for loan repayment. Cash reserves used for future capital projects are <br />also available for repayment. One of the future capital projects may include the <br />tentatively planned 2012 Ziegler Reservoir Enlargement Project. <br />The 2009 Service Fee Rate structure and System Development Fee charges are <br />included in Appendix B. The District bills on a quarterly basis. <br />Financial Impacts and Need <br />The DistricYs primary need for this project is to improve reliability by enabling the District <br />to better respond to a catastrophic event that would render its direct flow sources <br />untreatable or unavailable. A catastrophic event could be the result of drought, forest <br />fires, raw water contamination or unacceptable raw water turbidities. As the District <br />currently doesn't have stored water available, an interruption in direct flows could <br />significantly impair the District in meeting its municipal demands. <br />The District does not anticipate that additional assessments or increases in User Fees <br />will be necessary to cover the expenditures for this project. <br />Repayment Sources <br />The District's primary sources of revenue that will be used for repayment are service <br />fees and system development fees. <br />Amendment One (TABOR~ Impacts <br />The Snowmass Water and Sanitation District operates as an enterprise fund and in <br />accordance with the Tabor amendment. As such the District has established emergency <br />reserves of at least 3% of the Fiscal Year Spending excluding bonded debt service. The <br />projected tax revenue to the District will remain the same. The District has primarily <br />three saurc~s income: property taxes; system development fees and service charges. <br />The ability to repay the loan will not require a tax increase. <br />11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.