My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150294 Approval Letter
CWCB
>
Loan Projects
>
DayForward
>
1001-2000
>
C150294 Approval Letter
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:26:00 AM
Creation date
10/14/2009 1:07:48 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150294
Contractor Name
Snowmass Water & Sanitation District
Contract Type
Loan
Water District
0
County
Pitkin
Loan Projects - Doc Type
Approval Letter
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
STATE OF COLORADO <br />Colorado Water Conservation Board <br />Department of Natural Resources <br />1313 Sherman Street, Room 721 <br />Denver, Cqlorado 80203 <br />Phone: (303) 866-3441 <br />Fax:(303)866-4474 <br />www.cwcb.state.co.us <br />TO: Colorado Water Conservation Board Members <br />FROM: Kirk Russell, PE ~~ <br />Mike Serlet, PE, Chief ~~ <br />Water Supply Planning & Fir~ance Section <br />DATE: May 12, 2009 (UPDATED May 22, 2009) <br />B~II Ritter, Jr. <br />Govemor <br />Harris D. Shem~an <br />DNR Executive Director <br />Jennifer L. Gimbel <br />CWCB Director <br />Dan McAuliffe <br />CWCB Deputy Director <br />SUBJECT: Agenda Item 17f, May 19-20, 2009 Board Meeting <br />Water Supply Planning and Finance Section - New Project Loans <br />Snowmass Water & Sanitation District - Ziegler Reservoir Water Management <br />System <br />Introduction <br />The Snowmass Water & Sanitation District (District), acting by and through its water activity <br />enterprise, is applying for a$1,933,4701oan for the Ziegler Reservoir Water Management System <br />(Project). The Project includes a new pnmp house, 16 inch bidirectional pipeline, and a flow control <br />building. The total cost estimate for the Project is $2,149,000. The Project is necessary in order to <br />utilize the recently purchased Ziegler Reservoir (Reservoir) and provide much needed storage for <br />drought and natural disaster protection. The loan request is for approximately 90% of the Project <br />costs. See attached Project Data Sheet. <br />Staff Recommendation (Board approved Staff Recommendation on May 19, 2009) <br />Staff recommends the Board approve a loan not to exceed $1,952,805 ($1,933,470 for project costs <br />and $19,335 for the 1% Loan Service Fee) to the Snowmass Water & Sanitation District, acting by <br />and through its water activity enterprise, for the Ziegler Reservoir Water Management System from <br />the Construction Fund Account. The loan terms shall be an interest rate of 4.25% per annum for 20 <br />years. Security for the loan shall be in compliance with CWCB Financial Policy #5. <br />Background <br />In 2008 the District purchased Ziegler Reservoir to improve the water system reliability by enabling <br />the District to respond to a catastrophic event that would render its direct flow sources untreatable <br />or unavailable. The Reservoir will assist the District in accomplishing its Stream Flow Stewardship <br />Goal of 7 cfs bypassing the District's Snowmass Creek Pump Station diversion. The District <br />Water Supply Protection • Watershed Protection & Flood Mitigation • Stream & Lake Protection • Water Supply Planning & Finance <br />Water Conservation & Drought Planning • Intrastate Water Management & Development <br />
The URL can be used to link to this page
Your browser does not support the video tag.