My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150252 Feasibility Study
CWCB
>
Loan Projects
>
DayForward
>
1001-2000
>
C150252 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/24/2014 2:04:10 PM
Creation date
10/14/2009 1:06:19 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150252
Contractor Name
Henrylyn Irrigation District
Contract Type
Loan
Water District
0
County
Weld
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
169
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
is based on the price of water sold in Eastern and Northern Colorado over the past few years. CBT <br />water is currently selling for $10,000 per unit. Water with a high priority number or that can be used <br />for M&I use or consumptive use has sold for as high as $20,000 per acre foot. Based on the decree <br />dates and seniority of the decrees, we believe a reasonable value to be $6,000 per acre foot. <br />Using the average value of the water, assuming 15,046 acre-feet, <br />Benefit/Cost =[$6,000 x 15,046 A-Ft] =$ 3,361,797 = 26.9 <br />COLLATERAL <br />The Henrylyn Irrigation District can offer the following collateral for the CWCB loan. <br />1. The revenue from assessments as allowed by the Company's Rules and Regulations. <br />2. Assignment of the land and physical assets at the reservoir sites to the CWCB. <br />IMPLEMENTATION SCIiEDULE <br />The following schedule is proposed for implementation of the project. <br />Task Taz e~ t Com~lerion Date <br />1. Feasibility Study Completed 5/25/07 <br />2. Submit to CWCB 6/1/07 <br />3. CWCB Board Action 7/23/07 <br />4. Prospect Dam <br /> Start Design 8/1/07 <br /> Finish Prospect Design 10/1/07 <br /> Submit To SEO 10/1/07 <br /> Review By SEO Completed 1/1/08 <br /> Project Bid 1/15/08 <br /> Award Bid 2/1/08 <br /> Start Construction 3/1/08 <br /> Complete Construction 5/1/08 <br />5. Horsecreek Dam <br /> Start Design 7/1/08 <br /> Finish Design 12/1/08 <br /> Submit To SEO 12/1/08 <br /> Review By SEO Completed 5/1 0~- rA <br /> Project Bid 6/1/A$- ~~ <br /> Award Bid 7/1/~-o~i <br /> Start Construction 9/1/~ - o~ <br /> Complete Construction 3/1/~ - ~o <br />Horsecreek & Prospect Reservoirs - 06.014 <br />Henrylyn Irrigation District Page 21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.