Laserfiche WebLink
Project Summary — The Deuel and Snyder Improvement Company — <br />Contract No. C150288 <br />SECTION 1 — BORROWER INFORMATION <br />Name: The Deuel and Snyder Improvement Company <br />Address: P.O. Box 89 <br />Contact: Scott Kembel <br />Phone Number: 970 - 867 -2883 Fax Number: 970 - 867 -2884 <br />E -mail address: jekembel @yahoo.com <br />Type of Entity: a Colorado nonprofit corporation <br />Section 2 — Project Description <br />A. Description of PROJECT: The BORROWER applied to the CWCB for a loan to be <br />used for the construction of the River Sand Gate Structure Project, located in <br />Morgan County, hereinafter referred to as the PROJECT, at an estimated total cost <br />of $90,000. <br />B. Description of Feasibility Study: The CWCB has reviewed a feasibility study report <br />on the PROJECT entitled "Feasibility of the Rehabilitation of the Deuel and Snyder <br />Improvement Company River Sand Gate Structure," dated February 2009, compiled <br />by Brent Nation, P.E., which is incorporated herein by reference, and, based upon <br />the feasibility report, the CWCB determined the PROJECT to be technically and <br />financially feasible. <br />SECTION 3 — CWCB'S AUTHORITY <br />Severance Tax Trust Fund Perpetual Base Account: This loan is made pursuant to <br />the provisions of §§ 39- 29- 109(1)(a)(1), 37 -60 -119 and 37 -60 -120, C.R.S., which <br />authorize the CWCB to loan money for water projects from the CWCB Severance Tax <br />Trust Fund Perpetual Base Account for the benefit of the people of the state, provided <br />that the borrower assures repayment of that money. <br />Small Pro'ect Loan: This loan is made pursuant to the provisions of §§ 37 -60 -119 and <br />37 -60 -120, C.R.S., which authorizes the CWCB to loan money for water projects for the <br />benefit of the people of the State, provided that the borrower assures repayment of that <br />money. <br />Section 37- 60- 122(1)(b) C.R.S., authorizes the CWCB to make loans of up to <br />$10,000,000 from the CWCB's Construction Fund and the State Severance Tax Trust <br />Fund Perpetual Base Account Fund without prior approval from the General <br />Assembly. <br />SECTION 4 - BOARD APPROVAL <br />At its March 2009 meeting, the CWCB approved a Small Project Loan from the <br />Construction Fund to the BORROWER in an amount up to $90,000 for PROJECT costs, not to <br />exceed 90% of the cost of the PROJECT, with a loan origination fee of 1 % in accordance with <br />CWCB Policy No. 16, at an interest rate of 2.50% per annum for a repayment term of 30 <br />years. <br />Appendix 1 to Loan Contract C150288 <br />Page 1 of 4 <br />