My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9705
CWCB
>
UCREFRP
>
Public
>
9705
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/11/2009 11:32:58 AM
Creation date
8/10/2009 5:12:54 PM
Metadata
Fields
Template:
UCREFRP
UCREFRP Catalog Number
9705
Author
Green River Study Plan ad hoc Committee.
Title
Study plan for the implementation and evaluation of flow and temperature recommendations for endangered fishes in the Green River downstream of Flaming Gorge Dam.
USFW Year
2007.
USFW - Doc Type
Upper Colorado River Endangered Fish Recovery Program
Copyright Material
NO
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Table A3. Continued. <br /> <br />General Flow and Temperature Relevant Studies <br />Recommendations Anticipated Effects and Uncertainties (Hypotheses) (primary studies in bold) <br />(Muth et al. 2000) <br />Reach 2-Spring Peak (continued) , <br />Peak flows in Reach 2 should be of the Uncertainties U5-I. Western aerial photography of2005 <br />magnitude, timing, and duration to U5. The area of terrace and depression floodplains inundated at peak flow <br />provide floodplain inundation in the different flows (U.S. Department of the Interior 2006). U5-2. Evaluation of restoration and <br />Ouray portion of the river (continued) management options for Ouray NWR <br /> U5-3. Proiect Cap-6HYD <br /> U6. Flow and stage at which floodplains with levee breaches U6-I. Western aerial photography of 2005 <br /> become sufficiently inundated (area, depth, volume) to provide peak flow <br /> nursery habitat for razorback suckers (U.S. Fish and Wildlife U6-2 Project Cap-6HYD <br /> Service 2005). U6-3. Project Cap-6 rzIentr <br /> U6-4. Evaluation of restoration and <br /> management options for Ouray NWR <br /> U6-5. Project Cap-6 RZ <br /> U6-6. Project Cap-6 bt/rz <br /> U6-7. Proiect Cao-6 rzlbt <br /> U7. Area, depth, volume, and persistence of floodplain depression U7-I. Western aerial photography of 2005 <br /> habitat after peak flows recede and the relationship, if any, . peak flow <br /> between these and the magnitude of the peak flow (U.S. U7-2. Evaluation of restoration and <br /> Department of the Interior 2005; U.S. Fish and Wildlife Service management options for Ouray NWR <br /> 2005). U7-3. Project Cap-6 RZ <br /> U7-4. Project Cap-6 bt/rz <br /> U7-5. Proiect Cap-6 rzlbt <br /> U8. Abundance and entrainment of drifting razorback sucker U8-I. Project Cap-6rzlentr <br /> larvae as a function of distance from the razorback sucker U8-2. Project 22f <br /> spawning bar (U.S. Department of the Interior and Western Area U8-3. Project Cap-6 bt/rz <br /> Power Administration 2005). <br /> U9. Entrainment and retention of larvae in floodplain nursery U9-I. Project Cap-6 rzlentr <br /> habitats as a function of the physical characteristics of the habitat U9-2 Project Cap-6HYD <br /> including size, volume, local hydraulic conditions, inlet(s), and U9-3. Project Cap-6 RZ <br /> outlet(s) (U.S. Fish and Wildlife Service 2005). U9-4. Evaluation of restoration and <br /> management options for Ouray NWR <br /> <br />~ <br />~ <br />~ <br />~ <br />~ <br />~ <br />~ <br />'-<:1 <br />'" <br />~ <br />~ <br /> <br />> <br />I <br />...... <br />0'1 <br /> <br />~ <br />c::r- <br />.... <br />l:: <br />~ <br /> <br />-~ <br />~ <br />c <br />C <br />'l <br />
The URL can be used to link to this page
Your browser does not support the video tag.