Laserfiche WebLink
<br />Table A3. Continued. <br /> <br />General Flow and Temperature Relevant Studies <br />Recommendations Anticipated Effects and Uncertainties (Hypotheses) (primary studies in bold) <br />(Muth et al. 2000) <br />Reach 2-Spring Peak (continued) , <br />Peak flows in Reach 2 should be of the Uncertainties U5-I. Western aerial photography of2005 <br />magnitude, timing, and duration to U5. The area of terrace and depression floodplains inundated at peak flow <br />provide floodplain inundation in the different flows (U.S. Department of the Interior 2006). U5-2. Evaluation of restoration and <br />Ouray portion of the river (continued) management options for Ouray NWR <br /> U5-3. Proiect Cap-6HYD <br /> U6. Flow and stage at which floodplains with levee breaches U6-I. Western aerial photography of 2005 <br /> become sufficiently inundated (area, depth, volume) to provide peak flow <br /> nursery habitat for razorback suckers (U.S. Fish and Wildlife U6-2 Project Cap-6HYD <br /> Service 2005). U6-3. Project Cap-6 rzIentr <br /> U6-4. Evaluation of restoration and <br /> management options for Ouray NWR <br /> U6-5. Project Cap-6 RZ <br /> U6-6. Project Cap-6 bt/rz <br /> U6-7. Proiect Cao-6 rzlbt <br /> U7. Area, depth, volume, and persistence of floodplain depression U7-I. Western aerial photography of 2005 <br /> habitat after peak flows recede and the relationship, if any, . peak flow <br /> between these and the magnitude of the peak flow (U.S. U7-2. Evaluation of restoration and <br /> Department of the Interior 2005; U.S. Fish and Wildlife Service management options for Ouray NWR <br /> 2005). U7-3. Project Cap-6 RZ <br /> U7-4. Project Cap-6 bt/rz <br /> U7-5. Proiect Cap-6 rzlbt <br /> U8. Abundance and entrainment of drifting razorback sucker U8-I. Project Cap-6rzlentr <br /> larvae as a function of distance from the razorback sucker U8-2. Project 22f <br /> spawning bar (U.S. Department of the Interior and Western Area U8-3. Project Cap-6 bt/rz <br /> Power Administration 2005). <br /> U9. Entrainment and retention of larvae in floodplain nursery U9-I. Project Cap-6 rzlentr <br /> habitats as a function of the physical characteristics of the habitat U9-2 Project Cap-6HYD <br /> including size, volume, local hydraulic conditions, inlet(s), and U9-3. Project Cap-6 RZ <br /> outlet(s) (U.S. Fish and Wildlife Service 2005). U9-4. Evaluation of restoration and <br /> management options for Ouray NWR <br /> <br />~ <br />~ <br />~ <br />~ <br />~ <br />~ <br />~ <br />'-<:1 <br />'" <br />~ <br />~ <br /> <br />> <br />I <br />...... <br />0'1 <br /> <br />~ <br />c::r- <br />.... <br />l:: <br />~ <br /> <br />-~ <br />~ <br />c <br />C <br />'l <br />