My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9705
CWCB
>
UCREFRP
>
Public
>
9705
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/11/2009 11:32:58 AM
Creation date
8/10/2009 5:12:54 PM
Metadata
Fields
Template:
UCREFRP
UCREFRP Catalog Number
9705
Author
Green River Study Plan ad hoc Committee.
Title
Study plan for the implementation and evaluation of flow and temperature recommendations for endangered fishes in the Green River downstream of Flaming Gorge Dam.
USFW Year
2007.
USFW - Doc Type
Upper Colorado River Endangered Fish Recovery Program
Copyright Material
NO
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Table AI. Continued. <br />Studies <br />Project 143 (continued) <br /> <br />Physical evaluation of <br />floodplain habitat <br />(project Cap-6HYD) <br /> <br />Western aerial <br />photography of 2005 <br />peak flow <br /> <br />Western backwater <br />topography study <br /> <br />USGS razorback <br />spawning bar study <br /> <br />Utah State <br />University lReclama tion <br />channel monitoring <br />studies <br /> <br />Study Goal and Objectives <br /> <br />Objectives 2. <br />1. Collect adult pike and take dorsal flesh samples at each reservoir and in the Yampa River. <br />2. Utilize stable isotope analysis to evaluate diet composition. <br />Goal <br />To restore floodplain habitats in a manner that will benefit endangered fishes, minimize potential <br />adverse effects, and be cost-effective. <br />Objectives <br />1. To determine bankfull flood flows, with and without excavation; <br />2. To determine area of inundation as a function of flow, with and without excavation; <br />3. To compare historical versus existing frequency, duration, and timing of flood flows, with and <br />without excavation; <br />4. To characterize pre-restoration baseline channel and site morphology, and post-restoration <br />morphology; <br />5. To develop design options for enhancing floodability; <br />6. To oversee construction activities; <br />7. To monitorresults <br />Goal <br />Document areas and elevations of inundation for floodplains with aerial photography during <br />spring peak flows. <br />Ob1ectives <br />1. Determine areas of floodplain inundation at various river flows. <br />2. Determine approximate elevations of inundation with various river flows. <br />Goal <br />Evaluate effect of seasonal and daily flow variability on backwater availability and quality. <br />Objectives <br />1. Monitor backwater dimension and depth as affected by seasonal and daily flow variability. <br />Goal <br />Assess effect of river flows on sediment deposition at the razorback sucker spawning bar on the <br />Green River. <br />Objectives <br />1. Measure sediment deposition on spawning cobbles at various river flows. <br /> <br />Goal <br />Describe geomorphic changes with flow, sediment transport and vegetation encroachment. <br /> <br />Status <br /> <br />Ongoing <br /> <br />Completed <br /> <br />Ongoing <br /> <br />Ongoing <br /> <br />Ongoing <br /> <br />FY <br /> <br />1996 - <br />TBD <br /> <br />2005 <br /> <br />2003 - <br />TBD <br /> <br />1998 - <br />2008 (data <br />will be <br />incorporate <br />d in Project <br />85t) <br />1995 - <br />TBD <br /> <br />~ <br />~ <br />~ <br />;] <br />~ <br />V:l <br />"l <br />~ <br />"'<: <br />~ <br />~ <br /> <br />> <br />I <br />....... <br />....... <br /> <br />~ <br />c:r- <br />... <br />~ <br />~ <br /> <br />.!'-> <br />l-v <br />c;::, <br />c;::, <br />'-l <br />
The URL can be used to link to this page
Your browser does not support the video tag.