Laserfiche WebLink
<br />GREEN RIVER STUDY PLAN <br /> <br />IV <br /> <br />February 2, 2007 <br /> <br />LIST OF TABLES <br /> <br />1. Anticipated effects and uncertainties associated with flow and temperature <br />recommendations for the Green River downstream of Flarning Gorge Dam.................. 18 <br /> <br />2. Eighteen highest ranked anticipated effects and uncertainties, listed by <br />resource category, related to flow and temperature recommendations for the <br />Green River downstream of Flaming Gorge Dam, studies that address hypotheses, <br />and topics not addressed by existing studies. ..................................................................21 <br /> <br />3. Timeline for recommended studies ................................................................................. 36 <br /> <br />4. Recommended changes to the Green River Action Plan: Mainstem section <br /> <br />of the RIPRAP ................................................................................................................. 38 <br /> <br />LIST OF FIGURES <br /> <br />1. Conceptual process for evaluation and revision of flow and temperature <br /> <br />recommendations............................................................................................................... 2 <br /> <br />2. Green River Subbasin and the three reaches of the Muth et al. (2000) flow and <br /> <br />temperature recommendations........................................................................................... 5 <br /> <br />3. Steps to developing the Green River Study Plan and formulation of <br /> <br />recommendations............................................................................................................. 15 <br /> <br />4. Strategy for integration and synthesis of study reports for evaluation <br />and recommended revision of flow and temperature recommendations ......................... 37 <br />