My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8149
CWCB
>
UCREFRP
>
Public
>
8149
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/11/2009 11:32:57 AM
Creation date
8/10/2009 4:48:17 PM
Metadata
Fields
Template:
UCREFRP
UCREFRP Catalog Number
8149
Author
Phenicie, C. K. and J. R. Lyons.
Title
Tactical Planning in Fish and Wildlife Management and Research.
USFW Year
1973.
Copyright Material
NO
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> Determine benefits and cos <br /> spawning marsh constructio <br /> management of lakes where <br /> suitable predator and natu <br /> inadequate. <br /> I <br /> r <br /> Measure the annual increment of capital amortization <br /> and document the yearly operation and maintenance costs. <br /> I <br />Develop experimental marshes for Operate and maintain experime <br />highest production at the least marshes for highest productio <br />cost, consistent with recruitment northern pike, consistent wit <br />needs. survival to recruitment into <br /> fishable population. <br /> I <br />Purchase or lease land for Produce engineering designs Develop procedures for <br />marsh development. for marsh development on management of each of the <br /> acquired lands. experimental spawning <br /> marshes. <br />I I <br />Select experimental lakes Determine the best Determine the most Determine <br />from the Department's survey physical and chemical productive and least and metho( <br />list with the help of con- characteristics of costly method of marsh 1 ing rel~( <br />sultations and further field artificiall1pawning util i ~ati ony-or marsh. ..J <br />checks, considering suitabil- marshes. - spawnl ng. <br />ity for experimental design. <br />Make physical determinations Refine physical criteria Make management determinations <br />from literature review and where necessary by field from literature review and <br />from consultations. experiments. from consultations. <br /> <br />8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.