Laserfiche WebLink
<br /> Determine benefits and cos <br /> spawning marsh constructio <br /> management of lakes where <br /> suitable predator and natu <br /> inadequate. <br /> I <br /> r <br /> Measure the annual increment of capital amortization <br /> and document the yearly operation and maintenance costs. <br /> I <br />Develop experimental marshes for Operate and maintain experime <br />highest production at the least marshes for highest productio <br />cost, consistent with recruitment northern pike, consistent wit <br />needs. survival to recruitment into <br /> fishable population. <br /> I <br />Purchase or lease land for Produce engineering designs Develop procedures for <br />marsh development. for marsh development on management of each of the <br /> acquired lands. experimental spawning <br /> marshes. <br />I I <br />Select experimental lakes Determine the best Determine the most Determine <br />from the Department's survey physical and chemical productive and least and metho( <br />list with the help of con- characteristics of costly method of marsh 1 ing rel~( <br />sultations and further field artificiall1pawning util i ~ati ony-or marsh. ..J <br />checks, considering suitabil- marshes. - spawnl ng. <br />ity for experimental design. <br />Make physical determinations Refine physical criteria Make management determinations <br />from literature review and where necessary by field from literature review and <br />from consultations. experiments. from consultations. <br /> <br />8 <br />