My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8012
CWCB
>
UCREFRP
>
Public
>
8012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/11/2009 11:32:57 AM
Creation date
8/10/2009 4:45:06 PM
Metadata
Fields
Template:
UCREFRP
UCREFRP Catalog Number
8012
Author
Grand Canyon Trust.
Title
Colorado River Workshop, issues, ideas, and directions (February 26-28, 1996 Phoenix, Arizona) An open forum for discussion of management issues between managers, water users, and stakeholders of the Colorado River basin.
USFW Year
1996.
USFW - Doc Type
1996.
Copyright Material
NO
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
242
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />about each of these themes - the piecemeal approach, <br />the inadequacy of information, and elevating competi- <br />tion over cooperation. <br /> <br />I will conclude that we are not doomed to repeating <br />history but actually may be moving, perhaps in fits and <br />starts, toward a fuller consideration of issues instead of <br />addressing them one at a time. We are assembling and <br />at least capable of basing decisions on better facts. And <br />we are discovering that cooperative dialogue can solve <br />more problems than competition and combat. <br /> <br />SOLVING PROBLEMS ONE AT A TIME <br /> <br />The history of the Colorado River - at least for us <br />lawyers, begins with the 1922 seven-state compact. <br />Though we celebrate it as a breakthrough in interstate <br />relations, all it addressed was one question: how to <br />carve up the rights to consume water among the seven <br />states that touched it. What it actually did was even <br />less. Crudely, it divided the river into two sub-basins <br />and said that the states of each sub-basin would share <br />collectively about half the water. That's it. <br /> <br />Problem solved? To be sure, we reached agreement on a <br />compact, but not even all the seven states that negotiat- <br />ed it ended up ratifying it. Arizona held out for <br />decades. States within the two basins barely talked to <br />one another, let alone figured out how to use their <br />respective "halves" of the river's resources. <br /> <br />Then we moved into development of the river. The <br />motive was how to enable each basin to make the con- <br />sumptive uses authorized by the compact. But develop- <br />ment became a purpose in itself. Early development on <br />the river was consistent with the 1902 Reclamation Act <br />- a law written to help settle the West with small fam- <br />ily farms by enabling them to grow crops in an arid <br /> <br />10 <br /> <br />region. Hoover Dam, constructed under the Boulder <br />Canyon Project Act primarily as a source for agricul- <br />tural water, was also authorized for flood control of the <br />once wild river. It was outfitted with power generating <br />turbines, too. After all, boosters from a young and <br />growing Los Angeles gave their political support to fed- <br />eral funding of the project largely because of the <br />potential for a large, inexpensive source of electricity. <br /> <br />Inspired by Hoover's potential for performing multiple <br />functions, Congress began to authorize reclamation <br />projects throughout the West for multiple purposes. <br />That was the case with the 1956 Colorado River <br />Storage Project Act that authorized Glen Canyon and <br />several upper basin projects to generate power "as an <br />incident of" the primary purposes of water supply and <br />flood control. <br /> <br />The power-generating capacity of these facilities soon <br />eclipsed the importance of the system for delivering <br />water to the states according to the compact. <br />Ultimately, power sales have the capacity of producing <br />income to payoff project costs, reducing the burdens <br />on irrigators. So the states and irrigators uneasily sup- <br />ported the elevation of power generation as paramount <br />function of the Colorado River system. So we set out to <br />develop the river and did, using whatever justifications <br />and resources were available. It was not a program for <br />distributing benefits allocated by the compact and <br />other laws. <br /> <br />As water development in the basin moved forward, we <br />began to discover how much we had addressed. <br />Mexico had to be reckoned with. At the tail of the <br />river, it could take only what water was left over after <br />uses in the United States. And that amount diminished <br />with each dam and diversion upstream. Finally, in <br />1944 the treaty with Mexico was negotiated and we <br />
The URL can be used to link to this page
Your browser does not support the video tag.