Laserfiche WebLink
1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />ESTIMATED CAPITAL AND OPERATION/MAINTENANCE COSTS <br />ALTERNATIVE 1 - EAST BRANCH CREEK RESERVOIR <br />Costs in 1990 Dollars <br />CAPITAL COSTS <br />East Branch Creek Data $14,000,000 <br />Diversion Structure, Pumping Station, 57.6 cfs 1,730,000 <br />Pipelines, 42", 45,200 l.f. ON/l.f. 3,980,000 <br />Nighway Crossings, Railroad Crossings, <br />Irrigation Canal Crossings 290,000 <br />Access Road 30,000 <br />Release to Canal Structures 320,000 <br />--------------- <br /> $20,350,000 <br />30% Engineering, Legal, and Construction <br />Contingency Factor --6,100,000 <br />-$26,450,000 <br />OPERATION & MAINTENANCE COSTS <br />------------------------------- <br />Power Costs - Evaporation Makeup each year and refill reservoir <br />once every 4 years. <br />Evaporation Makeup 1,361,920 kwh <br />Will Reservoir 9,704,660 kwh/4yr = 2,426,170 kwh <br />------------ <br />3,788,090 kwh @50.08 5303,050 <br />Maintenance 100,000 <br />--------------- <br />AVERAGE ANNUAL 0/M 5403,050 <br />Land Requirement <br />Reservoir 575 Acres <br />Pipeline Route 7 Acres