My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7865
CWCB
>
UCREFRP
>
Public
>
7865
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/11/2009 11:32:57 AM
Creation date
8/10/2009 4:12:37 PM
Metadata
Fields
Template:
UCREFRP
UCREFRP Catalog Number
7865
Author
Wright Water Engineers, I.
Title
Estimated Costs for East Branch Creek and Adobe Creek Reservoir Systems and Colorado River Pumping Facilities.
USFW Year
1990.
USFW - Doc Type
\
Copyright Material
NO
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br /> Wright Water Engineers, Inc. H90 <br /> DENVER OFFICE GLENWOOD SPRINGS OFFICE <br /> 2490 West 26th Ave., Suite 100 A 818 Colorado Avenue <br /> Denver, Colorado 80211 P. O. Box 219 <br /> (303) 480-1700 Glenwood Springs, Colorado 81602 <br /> (303) 945-7755 <br /> Denver Direct Line: 893-1608 <br />1 March 21, 1990 <br /> <br /> Mr. Ed Rosar <br /> Industrial Resources, Inc. <br /> 215 Union Boulevard <br /> Suite 601 <br />' Lakewood, CO 80228 <br />' Re: Estimated Costs for East Branch Creek and Adobe Creek Reservoir Systems <br />and Colorado River Pumping Facilities <br />' Dear Mr. Rosar: <br />INTRODUCTION <br />' Wright Water Engineers has prepared conceptual level cost estimates for the East Branch <br />Creek and Adobe Creek reservoir system facilities and for Colorado River pumping <br />facilities. The conceptual plan is to divert water from the Colorado River via the decreed <br />Mack Pumping Pipeline right near Fruita. The diversion point is approximately thirteen <br />miles downstream of the Gunnison-Colorado River confluence. A project location map, <br />Figure 1, (at report back) shows the location of the reservoir system and pumping facilities. <br />The diverted water would be pumped to either one or both reservoirs which are located <br />above the Government Highline Canal (GHC) and the Grand Valley Canal (GVC) or <br />directly to the canals. The Government Highline and the Grand Valley Canals have senior <br />water rights on the Colorado River. Downstream from these canal diversions is a critical <br />15-mile reach of river where the streamflow is sometimes insufficient for endangered fish <br />species. By providing water from the reservoirs to the canals by exchange, the streamflow <br />of the Colorado River would be increased in the 15-mile reach, thereby providing improved <br />habitat for the endangered species. <br />Several alternatives to this conceptual plan are also analyzed. These alternatives include <br />pumping from the Colorado River directly to the Highline and Grand Valley Canals from <br />alternate points of diversion. <br /> <br /> <br />07 <br />
The URL can be used to link to this page
Your browser does not support the video tag.