Laserfiche WebLink
ARD-Fish and Wildlife Enhancement 2 <br />Summazy.._and, .Conclosiop <br />The analysis is based upon the remaining allocation calculated in <br />the March 30, 1983 memorandum (1,906,000 acre-feet above Lee Ferry, <br />1,675,000 acre-feet above the confluence of the Colorado and Green <br />Rivers). Depletions for projects that have undergone Section 7 <br />consultation (776,000 acre-feet) have been subtracted. Adjustments <br />(93,000 acre-feet) have been made for projects that can expand <br />their level of depletion without undergoing Section 7 consultation, <br />or were depleting in 1980 without a completed biological opinion. <br />Based upon these adjustments, 1,037,000 acre-feet remain to be <br />de he aver Basin, 868,000 acre-feet abbe <br />the confluence of the Colorado and Green Rivers. The following <br />table (all values in thousands of acre-feet) summarizes the <br />information by state: <br /> <br />Arizona <br />Colorado <br />New Mexico <br />Wyoming <br />Utah <br />Total <br />Notes: <br />Totall 19802 Biolog. 3 Remaining <br />Allocation Depletion Opinion Adjust,.. Allocation <br />50 34 16 0 <br />2,976 2,129 409 50 388 <br />647 432 46 169 <br />805 453 27 34 291 <br />1,322 846 340 -53 189 <br />5,800 3,894 776 93 1,037 <br />1. Based on Bureau of Reclamation estimate of basin yield and <br />portion available for depletion above Lee Ferry. <br />2. Depletions in 1980 estimated by Reclamation (August 1982) with <br />projects not completed, or completed Section 7 consultation, <br />removed. <br />3. Adjustments were made for projects not requiring Section 7 <br />consultation to increase depletions, or for projects depleting in <br />1980 without Section 7 consultation.