Laserfiche WebLink
1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />3.3.3 Scenario No. 3 <br />Scenario No. 3 is the same as Scenario No. 2 with the addition of Powder Wash <br />Project. The Powder Wash Project water rights are junior to the subject rights included <br />in Scenario No. 2. Scenario No. 3 output was compared with Scenario No. 2 output to <br />determine the incremental impacts of Little Snake Reservoir and Powder Wash Power <br />Plant. Results are presented in Section 4.0. <br />3.3.4 Scenario No. 4 <br />Under Scenario No. 4, the Little Snake River Basin was modeled with the addition <br />of only the Three Forks Project to the Water Development Baseline. Impacts due to <br />Three Forks Reservoir alone were determined by comparing Scenario No. 4 output to the <br />Water Development Baseline output. <br />3.3.5 Scenario No. 5 <br />This scenario included the addition of the Powder Wash Project only to the Water <br />Development Baseline. Impacts due to the Powder Wash Project alone were determined <br />by comparing Scenario No. 5 output to the Water Development Baseline output. <br />35