Laserfiche WebLink
<br />TABLE 5. SUMMARY OF WIRSOS INPUT FOR CONSOLIDATED THREE FORKS <br />PROJECT <br />Three Forks Reservoir Data <br />Colo. Three Forks Decree, priority date of 6-5-72 = 75,000 AF (1 annual fill) <br />Wyo. Three Forks Permit, priority date of 6-20-72 = 22,865 AF (1 annual fill) <br />Colo. Sheep Mtn. Decree, priority date of 6-5-72 = 75,000 AF (1 annual fill) <br />Minimum storage volume = 17,300 AF <br />Maximum storage volume = 172,865 AF <br />Maximum primary outlet capacity = 1,000 cfs <br />Initial storage volume at beginning of <br />study period (70% of Total) = 1201000 AF <br />Area - Capacity relationship (as developed by P&M, see Appendix C) <br />Instream Flow <br />Instream flow requirements in Little Snake River <br />between Three Forks Dam and Battle Creek = 24 cfs <br />Instream flow requirements below Battle <br />Creek mouth = 52 cfs <br />Industrial Diversion Data <br />Average approximate demand = 123 cfs <br />(Demand amount to be refined during firm yield study) <br />32