My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7748
CWCB
>
UCREFRP
>
Public
>
7748
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/11/2009 11:32:56 AM
Creation date
8/10/2009 3:59:40 PM
Metadata
Fields
Template:
UCREFRP
UCREFRP Catalog Number
7748
Author
Western Water Consultants, I.
Title
Final Report on Little Snake River Depletions by Pot Hook, Three Fork and Powder Wash Rights.
USFW Year
1990.
USFW - Doc Type
Laramie, WY.
Copyright Material
NO
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
152
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />I <br /> <br /> <br /> <br /> <br />TABLE 3. SUMMARY OF WIRSOS INPUT FOR POT HOOK PROJECT <br />Pot Hook Reservoir Data <br />Storage right, priority date of 6-5-59 (73,580 AF) = 6000 AF <br />Enlargement right, priority date of 4-19-66 (100,000 AF) = 0 AF <br />Minimum storage volume = 34,000 AF <br />Maximum storage volume (Scenarios 1 and 1A) = 60,000 AF <br />Maximum storage volume (Scenario 1B) = 100,000 AF <br />Maximum primary outlet capacity to Slater Creek = 1,000 cfs <br />Initial storage volume at beginning of <br />study period (70% Total) (Scenarios 1 and 1A) = 42,000 AF <br />Initial storage volume at beginning of <br />study period (70% Total) (Scenario 1B) = 70,000 AF <br />Area - Capacity relationship (as developed by USBR) (See Appendix C) <br />Instream Flow <br />Instream flow requirements in Slater Creek below dam = 24 cfs <br />Irrigation Diversion Data <br />Pot Hook Canal (canal capacity = 290 cfs) <br />Diversion right, priority date of 6-5-59, (260 cfs) = 260 cfs <br />Enlargement right, priority date of 4-19-66 (400 cfs) = 30 cfs <br />Two Bar Canal: <br />Diversion right, priority date of 6-5-59 = 100 cfs <br />Boone Lateral: <br />Diversion right, priority date of 6-5-59 = 16 cfs <br />Deer Lodge Lateral: <br />Diversion right, priority date of 6-5-59 = 23 cfs <br />Demand Schedule: <br />U.S.B.R. Diversion Demand Schedule <br />Irrigation Use Efficiencies and Return Flow Schedules: <br />Same as Water Development Baseline <br />For Scenario 1 the Two Bar Canal and Boone and Deer Lodge Laterals call upon storage <br />in Pot Hook Reservoir if direct flows are insufficient to meet demand. <br />For Scenarios 1A and 1B the Two Bar Canal and Boone and Deer Lodge Laterals <br />received direct flows only, they were not permitted to call on Pot Hook Reservoir <br />storage. <br />24 <br />
The URL can be used to link to this page
Your browser does not support the video tag.