My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7425
CWCB
>
UCREFRP
>
Public
>
7425
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/11/2009 11:32:56 AM
Creation date
8/10/2009 3:41:27 PM
Metadata
Fields
Template:
UCREFRP
UCREFRP Catalog Number
7425
Author
Vandas, S. e. a.
Title
Dolores River Instream Flow Assessment
USFW Year
1990.
USFW - Doc Type
Project Report.
Copyright Material
NO
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
126
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Table 6, Representative Monthly Flows With and Without the Project-Dolores River at McPhee <br /> <br /> Wet Year Normal Year Dry Year <br /> (second-feet) (second-feet) (second-feet) <br /> Pre- Post- Pre- Post- Pre- Post- <br /> Project Project Project Project Project Project <br />March 140 90 100 60 70 20 <br />April 2,190 920 980 60 170 20 <br />May 1,280 1,940 1 ,420 240 470 20 <br />June 1,150 460 1,030 290 130 20 <br />July 60 78 70 50 0 20 <br />August 30 78 70 50 20 20 <br />September 20 78 100 50 10 20 <br />October 20 78 90 50 20 20 <br />November 30 78 50 50 40 20 <br />December 40 78 60 50 40 20 <br />January 40 78 50 50 50 20 <br />February 50 78 60 50 50 20 <br /> <br />Source: USBR, 1977 <br /> <br />3. The maximum allowable diversions, based <br />upon the total capacity of the Dolores Tunnel <br />and the Great Cut Dike (1,340 ft3/s), were <br />subtracted from the computed spills. <br /> <br />4. The resulting outflows are only to be used as <br />an indication of potential 7-day outflows to the <br />Dolores River after total completion of the <br />Dolores Project. <br /> <br />Of the 14 years of record modeled, the following <br />7 -day high flows were determined for the upper river: <br /> <br />8 years or 57 percent had flows <br />greater then 700 ft3 Is <br />7 years or 50 percent had flows <br />. greater than 900 ft3 Is <br />6 years or 42 percent had flows <br />greater than 1100 ft3/s <br /> <br />20 <br /> <br />5 years or 36 percent had flows <br />greater than 1300 ft3 Is <br />4 years or 28 percent had flows <br />greater than 2500 ft3 Is <br />1 year or 7 percent had a flow <br />greater than 3700 ft3/s <br /> <br />From this analysis it was assumed that the 1.5- <br />year recurrence interval 7 -day high flow will be <br />approximately 1,000 ft3/s for the upper river. Thus <br />the channel forming flows expected to be released <br />after full development of the Dolores Project are <br />approximately 1000 ft3/s. <br />The outlet works at McPhee Dam, as stated in <br />the DPR and verified in conversations with the <br />Cortez Project Office (personal communication, Mr. <br />Mutz, Oct. 1989), will be operated to allow for <br />release through the outlet works of inflow design <br />floods between 1,000 and 2,500 ft3 Is. Releases of <br />
The URL can be used to link to this page
Your browser does not support the video tag.