My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7425
CWCB
>
UCREFRP
>
Public
>
7425
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/11/2009 11:32:56 AM
Creation date
8/10/2009 3:41:27 PM
Metadata
Fields
Template:
UCREFRP
UCREFRP Catalog Number
7425
Author
Vandas, S. e. a.
Title
Dolores River Instream Flow Assessment
USFW Year
1990.
USFW - Doc Type
Project Report.
Copyright Material
NO
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
126
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />LIST OF TABLES <br /> <br />Table 1. Dolores River Basin Hydrological and Physical Characteristics ....................................................12 <br /> <br />Table 2. Dolores River Annual Peak Flows ..................................................................................................14 <br /> <br />Table 3. Bank-full Flow Estimates at USGS Gauging Sites .........................................................................17 <br /> <br />Table 4. Bank-full Flow Estimated at Selected Locations Within the Study Area .......................................17 <br /> <br />Table 5. Average Annual Allocations of Dolores River at McPhee Dam .....................................................19 <br /> <br />Table 6. Representative Monthly Flows With and Without the Project- <br /> <br />Dolores River at McPhee ..................... ..... ................................. .................................... ..................20 <br /> <br />Table 7. 1.5- Y ear Recurrence Interval Flow Estimates for the Dolores River <br />at Selected Locations Post-McPhee Dam ........................................................................................21 <br /> <br />Table 8. Water Rights Tabulation, Dolores River - McPhee Dam to Bedrock, CO......................................24 <br /> <br />Table 9. Dolores River Summer Low Flow Estimates ..................................................................................25 <br /> <br />Table 10. Tally of Mid-Channel Bars .............................................................................................................. 28 <br /> <br />Table 11. Summary of Flow-Related Trip Attributes.......................................................................................41 <br />Table 12. Water Rights of 1 ft3/s or More ......................................................................................................52 <br /> <br />Table 13. Nonproject Water Rights Held by MVIC ........................................................................................ 55 <br /> <br />Table 14. Major Project Water Rights .............................................................................................................56 <br /> <br />Table 15. Annual Deliveries from McPhee Reservoir ..~................................................................................. 56 <br /> <br />Table 16. Water Rights Transferred by MVIC to DWCD ..............................................................................57 <br /> <br />Table 17. Water Use Upstream of McPhee Reservoir .....................................................................................57 <br /> <br />Table 18. Summary of Flow Evaluations ........................................................................................................67 <br /> <br />Table 19. Preferences for Flow Scenarios .......................................................................................................68 <br /> <br />Table 20. Weighted Usable Area for Life Stages at Various Flows(in ft2f1,OOO ft of stream) ....................... 71 <br /> <br />Table 21. Percent of Weighted Usable Area Related to Flow (Sept. 1 - March 31) .......................................72 <br /> <br />Table 22. Estimated Adjusunents in Channel Geometric and Morphological Features ................................. 75 <br /> <br />Table 23. Channel Geometry for Three Representative Cross Sections at Bank-Full .................................... 76 <br /> <br />Table 24. Hydraulic Geometric Relationships for Flows up to Bank-Full Discharge ....................................77 <br /> <br />ix <br />
The URL can be used to link to this page
Your browser does not support the video tag.