Laserfiche WebLink
i <br />Alternative Thermal Plant: <br />CAPACITY VALUE <br />Alternative Thermal Plant Study <br />Flaming Gorge <br />Platte River Power Authority's Rawhide plant <br />at Larimer, Colorado, is a 255 MW coal - fired <br />steam plant constructed in 1984. Rawhide is <br />an intermediate-load plant with a 48-percent <br />plant factor.) <br />The total cost of constructing the plant and <br />adjoining generating facilities was $1,113 per <br />kilowatt.V <br />1. Total Investment Cost per Kilowatt <br />II. Annual Capacity Costs <br />A. Annual Investment Cost per Kilowatt <br />Interest 7.86%3) <br />Depreciation 1.14%J <br />Insurance 0.25%5J <br />State and local taxes Q.00%6/ <br />Total 9.25% of $1,773.00 per kw <br />B. Annual Fixed Fuel Charges per Kilowatt/yr <br />C. Annual Fixed 0&M per Kilowatt/yr <br />D. Annual A&G per Kilowatt/yr <br />$1,173.00 <br />$164.00 <br />J $"'- 0.74 <br />J $ 18.16 <br />$ 13.72 <br />E. Annual Costs Associated with Transmission Sending Substation, <br />75 Mile Transmission Line and Receiving Substation per <br />Kilowatt/yr J $ 6.90 <br />F. Total Annual Capacity Cost in Dollars per Kilowatt $203.52 <br />III. Adjustments to Annual Capacity Cost <br />A. Mechanical Availability Adjustment per Kilowatt <br />17% of Total Annual Capacity Cost of $203.52 <br />B. Hydrological Flexibility Adjustment per Kilowatt <br />C. Total Adjustments to Annual Capacity Cost per Kilowatt <br />IV. Annual Capacity Value per Kilowatt <br />.LOJ $ 34.60 <br />DJ $ 10.18 <br />$ 44.77 <br />$248.30 <br />C-1