Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />RIVER FLOWS <br /> <br /> <br />Flows of the river are provided for this trip to provide a perspective of conditions encountered <br />during sampling (Table 6). The figures are provided by the Colorado Basin River Forecast Center of <br />the National Weather SeIVice (NOAA) in Salt Lake City, Utah. Flows for the Colorado River above <br />the contluence are estimated from the stream gauge located at Cisco. (RM 95.2). Flows for the Green <br />Riverabov~.~contluence are estimated from the stream gauge located at Green . River (RM 119.9). <br />Flowsin~taract Canyon are estimated from the combination of these two stream gauges since there <br />IlI'e rio significant inflows between these gauges and Lake Powell Allflows are recorded at 5:00 am. <br /> <br /> ESTIMATED RIVER FLOW (CFS) <br /> Cisco Green River Cataract <br />1 June 26 5,500 5,100 9,800 <br /> 27 4,800 5,000 9,800 <br /> 28 4,500 4,400 9,300 <br /> 29 4,300 4,200 8,800 <br /> 30 4,000 4,700 8,300 <br /> July 1 3,800 4,100 8,200 <br /> 2 3,600 4,300 7,700 <br />TRIP DATES ESTIMATED RIVER FLOW (CFS) <br /> Cisco Green River Cataract <br />2 September 27 2,750 1,600 4,500 <br /> 28 2,650 1,600 4,400 <br /> 29 3,200 1,500 4,350 <br /> 30 2,950 1,875 4,400 <br /> 1 3,000 1,700 4,775 <br /> 2 2,900 1,650 4,650 <br /> 3 4,750. 4,650 4,450 <br /> 4 4,250. 1,500 5,450 <br />· Heavy rains caused sudden increase in Cisco gage. <br /> <br /> <br />14 <br />