Laserfiche WebLink
Table 1. Dates and work performed for Little Snake River study, <br />Colorado, 1988. <br />May <br />24 Radiotracked by canoe from MCR 10 bridge (RMI 8.7) to Yampa River <br />confluence (RMI 0.0). Radiotracked on Yampa River to Deerlodge Park <br />take-out. <br />25 Radiotracked by canoe from Highway 318 bridge (RMI 15.7) to take-out <br />location (RMI 4.5). Sampled with trammel nets within canyon (RMI 8.0- <br />5.7). <br />June <br />8 Radiotracked by raft and sampled with trammel net from MCR 10 bridge <br />(RMI 8.7) to confluence (RMI 0.0), took-out at Deerlodge Park. Assisted <br />by Kathy Paulin (USFWS, Vernal,Utah). <br />13 Radiotracked by canoe from MCR 26 river ford (RMI 34.7) to Highway 318 <br />bridge (RMI 15.7). <br />28 Radiotracked by canoe and sampled with trammel net, seine, and dipnet <br />from MCR 10 bridge (RMI 8.7) to confluence (RMI 0.0), continued to <br />Deerlodge Park take-out. <br />July <br />26 Sampled pool at Highway 318 bridge (RMI 15.7) with trammel net and <br />seine. Hiked into canyon area (RMI 8.0-7.0) and sampled with trammel net <br />and seine. <br />27 Measured discharge near USGS gaging station at MCR 10 bridge (RMI 8.7) <br />and at take-out location (RMI 4.5). <br />28 Hiked into canyon below MCR 10 bridge and fished lower pool (RMI 7.4). <br />Oct <br />1 Measured discharge near USGS gaging station at MCR 10 bridge (RMI 8.7) <br />and at take-out location (RMI 4.5). <br />Hiked into canyon below MCR 10 bridge and fished lower pool (RMI 7.4). <br />4