Laserfiche WebLink
<br />Page <br /> <br />TABLES <br />Table I - Statistical Data for Principal Reservoirs in <br />Colorado River Basin, Upper Basin ""',', I I <br />Table 2 - Statistical Data for Principal Reservoirs in <br />Colorado River Basin, Lower Basin ""'" 12 <br />Table 3 - Estimated Virgin Flow at Lee Ferry , , 22 <br />Table 4 - Historic Flow at Lee Ferry, 1953- I 987 24 <br />Table 5 - Colorado River Storage Project, <br />Fiscal Year 1988 Program ""',""," 60 <br />Table 6 - Appropriations by the Congress for the Colorado <br />River Storage Project and Participating Projects ' , , , , 6 I <br /> <br />PICTURES <br /> <br />An upstream view across the crest of Navajo Dam shows the <br />hydrofraise cutting a diaphragm wall on the left abutment. 38 <br />A view of Mt. Elbert Powerplant looking south across <br />the lower Twin Lake, """"""".'", 43 <br /> <br />Upper Stillwater Dam, part of the Bonneville Unit of the <br />Central Utah Project, is the Bureau of Reclamation's <br />first "roller compacted concrete" dam, , , , , , , , , , 49 <br />A view looking toward the west or right abutment of Fontenelle <br />Dam shows the overall hydrofraise setup, ,""""" 5 I <br /> <br />VII <br />