My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7313
CWCB
>
UCREFRP
>
Public
>
7313
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/11/2009 11:32:55 AM
Creation date
8/10/2009 3:19:27 PM
Metadata
Fields
Template:
UCREFRP
UCREFRP Catalog Number
7313
Author
Upper Colorado River Commission.
Title
Forty-Second Annual Report of the Upper Colorado River Commission
USFW Year
1990.
USFW - Doc Type
Colorado River Storage Project and Participating Projects.
Copyright Material
NO
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Reclamation is receiving inquiries about power development on Dia- <br />mond Fork. To facilitate non-Federal power development, Reclamation <br />and the Western Area Power Administration have been considering the <br />issuance of a Federal Register notice. Such notice would seek comments <br />on proposed evaluation, selection and marketing criteria for non-Federal <br />hydroelectric power development at Colorado River Storage Project and <br />participating projects facilities. <br /> <br />Legislation was introduced in 1990 by the Utah congressional delega- <br />tion to increase the ceiling for the Colorado River Storage Project, primarily <br />to allow completion of the participating Central Utah Project Bonneville <br />Unit. That legislation failed to pass and will be reintroduced in 1991. <br /> <br />Additional work will take place in 1991 at Upper Stillwater Dam. The <br />Upper Stillwater boating site, access road, and work center construction <br />contract was awarded in February of 1990 and will be completed by <br />September 1991. <br /> <br />The Upper Stillwater campground relocation construction contract was <br />awarded in February of 1989 and will be completed by July of 1991. <br /> <br />The Starvation Reservoir cooperative agreement to finish construction <br />of recreation facilities will be awarded in January of 1991 and will be <br />completed by September of 1992. <br /> <br />n. Vernal Unit. Reclamation is presently gathering design data for <br />designing modifications to Steinaker Dam as part of the Safety of Dams <br />program. While the existing dam is structurally sound, modifications will <br />enable the dam to better withstand an earthquake. It has been deter- <br />mined that during a strong earthquake, portions of the dam's foundation <br />could liquefy. A structural modification of the dam is necessary to prevent <br />that from happening. Tentative plans call for a construction contract for <br />modifying the dam in June ofl992. Construction is expected to last one <br />season, starting in the fall of 1992 and ending the following spring. <br /> <br />Work at Steinaker Dam will be timed so that there should be no inter- <br />ruption of water supplies from the dam to irrigators. The modification <br />work will be timed such that activity requiring the drawdown of the water <br />level will be performed in the fall after the irrigation season, with comple- <br />tion before spring runoff. <br /> <br />51 <br />
The URL can be used to link to this page
Your browser does not support the video tag.