My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7313
CWCB
>
UCREFRP
>
Public
>
7313
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/11/2009 11:32:55 AM
Creation date
8/10/2009 3:19:27 PM
Metadata
Fields
Template:
UCREFRP
UCREFRP Catalog Number
7313
Author
Upper Colorado River Commission.
Title
Forty-Second Annual Report of the Upper Colorado River Commission
USFW Year
1990.
USFW - Doc Type
Colorado River Storage Project and Participating Projects.
Copyright Material
NO
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />i. Bonneville Unit. Stage II construction ofJordanelle Dam is well <br />underway, The embankment is 25 feet above ground. During the winter <br />months, crews are working in the river outlet tunnel. Work on the em- <br />bankment will resume after the spring thaw. <br /> <br />Plans for construction in 1991 include diverting the Provo River <br />through the outlet tunnel in early July. The gap in the embankment <br />through which the river is now running will be filled, then the embank- <br />ment will be placed across the entire valley. <br /> <br />Construction is still on schedule for a 1992 completion of embank- <br />ment work, Work in 1993 will include installation of the gates and control <br />structures. Filling will begin in 1994, <br /> <br />A contract has been awarded to remove the OlsonjNiehart Tailings <br />which are in the reservoir basin. Over 300,000 cubic yards of mine tail- <br />ings will be removed, The major portion must be removed by July of <br />1991 so that construction of the dam will not be impacted. <br /> <br />Significant progress has been made concerning future recreation use at <br />Jordanelle. The Jordanelle Master Plan was scheduled for completed in <br />October of 1990. A contract for recreation management by the Utah <br />Division of Parks and Recreation was signed in December of 1990. An <br />Architectural and Engineering contract for design of recreation facilities <br />will be awarded in February of 1991. Designs should be completed by <br />July 1, 1992. The recreation construction contract should be awarded in <br />late 1992 with completion by July 1994. <br /> <br />Construction is progressing on the Syar Tunnel. The contract was <br />awarded in August of1988. By the end of1990, the 6.2 mile tunnel was <br />completely excavated. The contractor has placed about 50 percent of the <br />concrete lining in the tunnel, with completion of the contract anticipated <br />not later than the spring of 1992, <br /> <br />The condemnation suit with Utah Power and Light Company for the <br />acquisition of the Olmsted Diversion Dam, flowline, powerplant and water <br />rights on the Provo River was settled in 1990. <br /> <br />The Supplement to the Final Environmental Statement for the Dia- <br />mond Fork System was filed on February 26,1990. The document ad- <br />dresses revisions to the proposed system that would provide the convey- <br />ance facilities for the Irrigation and Drainage System of the Bonneville <br />Unit. <br /> <br />49 <br />